[Delivery Record] Somewhere in Kobe City
Introducing examples of responses to requests for installation in the vibration isolation stage.
We would like to introduce a case study of a customer who received an FRP tank from Iwatani Techno. 【Delivery Details】 ■Manufacturing Content: Drainage Tank, On-site Assembly Work ■Construction Location: Hyogo Prefecture ■Completion Date: June 2018 ■Tank Size (m): CSP-1.5×1.5×1.5
- Company:岩谷テクノ FRP事業部
- Price:Other