We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Design support software.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Design support software Product List and Ranking from 45 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Dec 03, 2025~Dec 30, 2025
This ranking is based on the number of page views on our site.

Design support software Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Dec 03, 2025~Dec 30, 2025
This ranking is based on the number of page views on our site.

  1. null/null
  2. アクアソフト Okayama//software
  3. ジーボックス Mie//software
  4. 4 オートフォームジャパン Tokyo//software
  5. 4 PTC ジャパン Tokyo//software

Design support software Product ranking

Last Updated: Aggregation Period:Dec 03, 2025~Dec 30, 2025
This ranking is based on the number of page views on our site.

  1. Parts Configuration Management System "Production Innovation Bom-jin"
  2. [Case Study of Electric Craftsman NX] Compared products from three companies and decided on ANDES Electric Craftsman. アクアソフト
  3. Electric Control Symbol Data Collection - e-Parts CAD Symbol Data ニューコム
  4. CATIA 3DMaster Designer (M3D) 兼松エレクトロニクス デジタル・サービス本部
  5. 4 Thorough Comparison of GD&T Advisor Basic and Advanced PTC ジャパン

Design support software Product List

106~120 item / All 122 items

Displayed results

[Case Study of Electric Craftsman NX] Compared products from three companies and decided on ANDES Electric Craftsman.

We will introduce a case where sending data as a PDF reduces the risk of garbled text and makes the exchange of drawing data easier.

We would like to introduce a case study of the implementation of "Denshō NX" at an electrical construction company located in Fukuoka Prefecture. Initially, the company did not use CAD and created drawings based on hand-written materials using Jw-cad. However, both writing instructions and creating drawings in CAD took a lot of time and effort. The decisive factors for adopting our product were the ability to quickly convert vector PDFs into CAD data, the option to add functionalities when creating construction drawings, and the capability to utilize the created data and import it into other companies' estimation software. This has led to time savings and cost reductions. 【Case Summary】 ■ Challenges: - It took a lot of time and effort to write instructions and create drawings in CAD. ■ Decisive Factors: - Ability to quickly convert vector PDFs into CAD data. - Option to add functionalities when creating construction drawings. - Capability to utilize created data and import it into other companies' estimation software. *For more details, please download the PDF or feel free to contact us.

  • 2D CAD Electrical

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Electric Craftsman NX Implementation Case] The usability of mouse operations and other features suits me well.

The file compatibility is high, and it's very convenient to open and edit PDF data! You can work efficiently.

We would like to introduce a case study of the implementation of "Denshō NX" at an electrical construction company in Okayama Prefecture. Before the implementation, a new person was assigned to handle drawings, and although they tried using JWCAD and AutoCAD, the usability was lacking. They found that the general aspects, such as mouse operations, matched well, leading to the decision to implement it. After the implementation, not only was the ease of use of specialized functions for electrical equipment layout notable, but the high file compatibility allowed for opening and editing PDF data, which was extremely convenient. [Case Overview] ■ Challenge: Tried using JWCAD and AutoCAD, but the usability was lacking. ■ Effects: - High file compatibility allowed for opening and editing PDF data, which was very convenient. - The ability to download and register free JW symbols enabled efficient work. *For more details, please download the PDF or feel free to contact us.

  • 2D CAD Electrical

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Electric Craftsman NX Introduction Case] The operation feel was so good that we had extra time during the operation explanation.

Editing drawings received from other companies is easy! A case where the work of creating drawings has become easier.

We would like to introduce a case study of the implementation of "Densho NX" at an electrical construction company located in Okayama Prefecture. The company had previously introduced CAD from another vendor but struggled to utilize it effectively, so they opted to use "Densetsu Win," which was more user-friendly. After seeing a demo, they noticed that new features had been added, and since it coincided with the timing for purchasing a new PC, they decided to make the purchase. They found that even with a basic understanding, the operation was intuitive, and the user experience was so good that they had extra time during the operation explanation. Additionally, the compatibility of the drawings was excellent, making it easy to edit drawings received from other contractors, which simplified the drawing creation process. [Case Overview] ■ Deciding Factor for Implementation: New features were added after seeing the demo ■ Effects - The user experience was so good that there was extra time during the operation explanation - The drawing creation process became easier *For more details, please download the PDF or feel free to contact us.

  • 2D CAD Electrical

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Electric Craftsman NX Introduction Case] Impressed by the simple operability, data compatibility, and dedicated features.

Thanks to the editing features unique to dedicated CAD software, the drawing time has been reduced to half of what it used to be.

We would like to introduce a case study of the implementation of "Denshō NX" at an electrical construction company located in Tokyo. Before the implementation, they were using JW_CAD and experienced issues such as garbled text and difficulties opening drawings during exchanges of drawing data with clients, leading to inconvenience regarding compatibility. After the implementation, thanks to the unique editing features of the dedicated CAD, the compatibility of drawing data improved, and functions like automatic wiring when moving devices reduced the drawing time to half of what it was before. [Case Summary] ■ Challenges - Experienced inconvenience regarding compatibility - Time-consuming and labor-intensive drawing and editing of wiring, etc. ■ Effects - Drawing time was reduced to half of what it was before, thanks to the unique editing features of the dedicated CAD. *For more details, please download the PDF or feel free to contact us.

  • 2D CAD Electrical

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Electrician NX Introduction Case] To be able to draw quickly and beautifully by incorporating CAD.

Organizing data has become easy! Although there was a lot of planning, it has become very simple to write.

We would like to introduce a case study of the implementation of "Denshō NX" at an electrical contracting company in Tochigi Prefecture. Before the implementation, they were drawing plans by hand, which took a lot of time, and they were struggling with extensive planning due to communication with construction companies. After the implementation, they were able to draw plans quickly and neatly, and organizing documents became easier. Additionally, although there was a lot of planning, it became very easy to create. 【Case Overview】 ■Challenge: Drawing plans by hand took a lot of time. ■Effects: - Plans can now be drawn quickly and neatly, and organizing documents has become easier. - Although there was a lot of planning, it has become very easy to create. *For more details, please download the PDF or feel free to contact us.

  • 2D CAD Electrical

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic Intensity Calculation (Support Design) Ver.5

Program for calculating seismic intensity using the static frame method for bridges with multiple vibration systems.

Using the static frame method, we calculate the natural period of the specified bridge section and the weight of the superstructure supported by each substructure.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【2024 Edition】Mechanical Design Support IRONCAD

Maximizing efficiency in design with IRONCAD.

"IronCAD Mechanical" is an add-in product for IRONCAD. It enhances the efficiency of design in IRONCAD with over 180 powerful utilities. It facilitates parameter design and allows for the streamlining and speeding up of processes that can often hinder design, such as property input and BOM creation. In version 2024, many features have been added to improve design efficiency, including enhancements to the notch direction of L-shaped steel, a function to search for elements with the same part number or part name at once, and a feature to detect BREP holes and convert them to IntelliShape.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Vectorworks Landmark 2025

Standalone version Lease monthly fee: 7,400 yen (excluding tax)

Basic package + Specialized features for landscaping A product for urban planning and landscaping industries equipped with design support functions for the landscaping field Introduction to Vectorworks 2025 Standalone Version Usage Type Can be used differently depending on the environment One license can be installed on two machines. Designers can switch between environments, such as an office desktop and a portable machine. *Only one machine can operate simultaneously. No license authentication or procedures required Startup uses internet authentication. After the initial authentication, it can be used for 90 days without being connected to the network. *After the initial authentication, if started in a network-connected environment, authentication will be performed automatically.

  • 3D CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study on the Implementation of Data Center Operations Management Solutions: Kao Data Corporation

Maximize operational efficiency! We will introduce successful case studies that verify the feasibility of design proposals using complex indirect evaporative cooling.

This is a case study on the introduction of digital twin technology for operational management of data centers using thermal flow analysis, titled 'Cadence Reality DC Design.' In 2018, Kao Data began operations of the first data center, KDL1, out of four planned data centers on a campus of approximately 146,000 m². To establish an energy-efficient design, the company considered an indirect evaporative cooling system that uses water evaporation to cool air instead of a mechanical cooling system. They collaborated with us to validate the design of the indirect evaporative cooling system within the facility using '6SigmaDigital Twin.' The company designed a data center that achieves high performance without using any mechanical cooling. [Case Overview] ■ Scope of Application: Design and operation of colocation data centers ■ Software Used: Cadence Reality DC Design *For more details, please refer to the PDF document or feel free to contact us.

  • Software (middle, driver, security, etc.)

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Electric Craftsman NX Introduction Case] Switching from free CAD to Electric Craftsman due to efficiency.

Here is an example of a smooth transition to the current electrician!

We would like to introduce a case study of the implementation of "Denshō NX" at an electrical construction company located in Miyagi Prefecture. The company was struggling with estimating due to the increasing scale of the projects they handled, but they decided to implement the system after realizing that they could receive comprehensive proposals and felt that they could have a long-term relationship. After the implementation, work efficiency improved. In particular, the ease of CAD conversion of PDF drawings, the operation of reference drawings for layer settings, and the functionality of cutting and copying, which is effective during meetings, proved to be very convenient when creating enlarged drawings. In fact, this feature has become a favorite. 【Case Overview】 ■Challenge: The company was struggling with estimating due to the increasing scale of the projects they handled. ■Effects: - Improved work efficiency - Features such as CAD conversion of PDF drawings are very convenient when creating enlarged drawings. *For more details, please download the PDF or feel free to contact us.

  • 2D CAD Electrical

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Electric Craftsman NX Introduction Case] I've been using it since the days of DenSetsu Win after switching.

Smooth exchange of drawings with other companies! A case of switching from handwritten to our products.

We would like to introduce a case study of the implementation of "Den-sho NX" at an electrical construction company located in Osaka Prefecture. Before the implementation, all drawings were created by hand. Due to the many tedious tasks such as tracing, the ability to exchange data became the reason for the implementation. After the implementation, creating electrical drawings for classrooms in elementary, middle, and high schools became very easy, and it has been helpful that if they are separated by layers, they can be reused. 【Case Overview】 ■ Challenges: All drawings were created by hand, and there were many tedious tasks such as tracing. ■ Effects - Creating electrical drawings for classrooms became very easy. - Panel diagrams and high-voltage single-line connection diagrams are also utilized by editing them in common. - The exchange of drawings with other companies has become smooth. *For more details, please download the PDF or feel free to contact us.

  • 2D CAD Electrical

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Electric Craftsman NX Introduction Case] Even beginners without knowledge can create drawings if they grasp the tips.

We will introduce a case where the drawing time was shortened by being able to use Jw_cad drawings as they are.

We would like to introduce a case study of the implementation of "Denshō NX" at an electrical contracting company in Aichi Prefecture. Before the implementation, drawings were created by hand, which took a lot of time, and due to the drawings getting dirty, it was difficult to finish them neatly. After the implementation, even beginners without electrical knowledge could create drawings as long as they remembered the tips, and the ability to use Jw_cad drawings directly helped shorten the drawing time. Additionally, the capability to convert to Jw_cad and send via email has become a strong point. 【Case Overview】 ■Challenges - Drawings were created by hand, which took a lot of time. - It was difficult to finish the drawings neatly due to them getting dirty. ■Effects - Even beginners without electrical knowledge could create drawings. - The ability to use Jw_cad drawings directly helped shorten drawing time. *For more details, please download the PDF or feel free to contact us.

  • 2D CAD Electrical

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Electrician NX Introduction Case] Easy to place electrical symbols for low voltage and communication.

Introducing a case where the electric installation WinLight has been upgraded to the more feature-rich Denko Jr.!

We would like to introduce a case study of the implementation of "Denshō NX" at an electrical construction company in Hyogo Prefecture. The company needed to find a new CAD system after the manufacturer of the CAD they had been using for decades went bankrupt. They introduced a general-purpose CAD and attended training sessions, but found the operation difficult and gave up on using it. After learning about this product through advertising, they decided to implement it because the auxiliary line function for drafting was very convenient. After implementation, they have been able to read AutoCAD drawings and create electrical diagrams, finding it easy to place electrical symbols for weak current, communication, fire alarms, and school broadcasting. [Case Overview] ■ Challenge: Although they introduced a general-purpose CAD, they gave up due to difficulty in operation. ■ Effects: - It is easy to place electrical symbols for weak current, communication, fire alarms, and school broadcasting. - Drafting tables is easier compared to Excel. *For more details, please download the PDF or feel free to contact us.

  • 2D CAD Electrical

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study of Electric Craftsman NX] Better operability and increased drawing speed compared to Densetsu Win.

A case where the number of clicks on the correction command decreased, leading to a speedup.

We would like to introduce a case study of the implementation of "Denshō NX" at an electrical contracting company in Fukuoka Prefecture. Before the implementation, there was a lot of data importing from JWCAD, and frequent modifications were made. However, since the JW specifications' layers could not be used, it took time for searches and the drawing modification work was cumbersome. After the implementation, there was some difficulty in using the ribbon bar and other Office-like features, but we quickly got used to it and transitioned smoothly. The number of clicks for commands related to architectural drawing modifications and adjustments for lighting equipment and wiring decreased, leading to increased speed. [Case Overview] ■ Issues - Frequent modifications due to a lot of data importing from JWCAD - Cumbersome drawing modification work ■ Effects - Decreased number of clicks for commands related to architectural drawing modifications and adjustments for lighting equipment and wiring *For more details, please download the PDF or feel free to contact us.

  • 2D CAD Electrical

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Gravity

Gravity

The ODB++ GERBER data can be used by the customer for inspection purposes. It is equipped with a variety of features. You can check all components, nets, and wiring regardless of the CAD used.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration