Insulation Pre-cut Method "Raku Puru"
Shortening construction time due to a shortage of carpenters! A method that reduces the average construction time from 1 day to about 1 hour.
"Raku-Pure" is a construction method that solves various issues on site, such as the increase in waste materials and the decline in workability. According to energy-saving housing guidelines, the thickness of insulation materials is on the rise, leading to an increase in the number of materials used. However, with this method, there is no waste generated, eliminating disposal costs. [Features] ■ Shortened construction time ■ No waste generated ■ No disposal costs for waste ■ Improved yield ■ Prevention of losses due to mistakes on site *For more details, please refer to the catalog or feel free to contact us.
- Company:キョーリン
- Price:Other