[Installation Example] Aibori Junior High School, Suzaka City, Nagano Prefecture - Solar Power Plant
The solar power generation area is 720m2, and here is an introduction to the case of installing solar power generation on the school building roof and the gymnasium and martial arts hall roofs!
We would like to introduce a case study of our solar power generation roof leasing business conducted at Aibori Junior High School in Suzaka City, Nagano Prefecture. Solar panels with a generation output of 127.6 kW and a power conditioner with a generation output of 100.0 kW were installed on the roofs of the school building, gymnasium, and martial arts hall. As additional equipment, we installed an emergency power supply system for the gymnasium, LED lighting for the staff room, and a solar power generation display device. [Overview] ■ Completion Date: October 2012 ■ Location: Suzaka City, Nagano Prefecture ■ Generation Output (Modules): 127.6 kW ■ Generation Output (Power Conditioner): 100.0 kW *For more details, please refer to the PDF materials or feel free to contact us. Sun Junior HP - https://www.sunjunior.co.jp/
- Company:サンジュニア 本社
- Price:Other