Solar Power Generation System [Construction Achievement Case 85]
Panasonic 7.410kw VBHN247WJ01
Responsibility for design and construction of solar power systems at Attic without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on a wealth of experience gained from many years of roofing work for major housing manufacturers. Since we do not subcontract, we can quickly respond to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Panasonic Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P2
Applications/Examples of results
■K's residence, Nasushiobara City, Tochigi Prefecture ■Construction date: August 2019 ■Construction period (installation and electrical work): 2 days ■Selected model specifications: Panasonic ■Mounting method: Metal vertical standing seam method ■Module: 7.410kw VBHN247WJ01
catalog(1)
Download All CatalogsCompany information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.



![Solar Power Generation System [Construction Achievement Case 4]](https://image.mono.ipros.com/public/product/image/337/1377866015/IPROS_16929357169130217000.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 253]](https://image.mono.ipros.com/public/product/image/3d5/2000162298/IPROS1893365629956051953.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 270]](https://image.mono.ipros.com/public/product/image/549/2000168132/IPROS5371673571133657915.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 540]](https://image.mono.ipros.com/public/product/image/d42/2000239268/IPROS5008458178261180518.jpg?w=280&h=280)
![[For Commercial Facilities] Muroran City: Achieving both electricity cost savings and power outage measures with self-consumed solar power!](https://image.mono.ipros.com/public/product/image/2117111/IPROS16405979355836475567.jpg?w=280&h=280)

![[Article] Explanation of subsidies for solar power generation in Aichi Prefecture!](https://image.mono.ipros.com/public/product/image/c4a/2000704737/IPROS47481311375926390641.png?w=280&h=280)
![[Column] Advantages and Disadvantages of Solar Power PPA Business](https://image.mono.ipros.com/public/product/image/e34/2000667961/IPROS04478790006577702378.png?w=280&h=280)
![[For Schools] Muroran City: Disaster Prevention with Self-Consumption Solar Power! Reducing Renewable Energy!](https://image.mono.ipros.com/public/product/image/2117111/IPROS10063704435844314889.jpg?w=280&h=280)



