Solar Power Generation System [Construction Record Case 419]
Mitsubishi 2.96kw PV-MX185HA-C
Responsibility for design and construction of solar power systems at Attic without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design to construction and aftercare of solar power generation (including all-electric systems), based on its extensive experience in roofing work for major housing manufacturers over many years. Since we do not subcontract, we can quickly respond to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Mitsubishi Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P2
Applications/Examples of results
■N's residence, Bando City, Ibaraki Prefecture ■Construction date: May 2012 ■Construction period (installation/electricity): 3 days ■Selected model specifications: Mitsubishi ■Mounting method: Metal horizontal roofing hardware ■Module: 2.96kw PV-MX185HA-C
catalog(1)
Download All CatalogsCompany information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar power generation system [Construction Achievement Case 87]](https://image.mono.ipros.com/public/product/image/bd3/2000118292/IPROS5561057954735184181.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 274]](https://image.mono.ipros.com/public/product/image/929/2000171144/IPROS6559073528291205204.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 335]](https://image.mono.ipros.com/public/product/image/aaf/2000191445/IPROS2456010832504678327.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 466]](https://image.mono.ipros.com/public/product/image/d39/2000228478/IPROS6296806584084527308.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 586]](https://image.mono.ipros.com/public/product/image/4f0/2000251523/IPROS4309543621822830652.jpg?w=280&h=280)
![[Case Study] Shinano no Hoshi Headquarters](https://image.mono.ipros.com/public/product/image/4d4/2001173976/IPROS70511111493290832255.png?w=280&h=280)
![[Column] Advantages and Disadvantages of Solar Power PPA Business](https://image.mono.ipros.com/public/product/image/e34/2000667961/IPROS04478790006577702378.png?w=280&h=280)
![[For Schools] Hakodate City: Reduce Electricity Costs and Renewable Energy with Self-Consumption Solar Power!](https://image.mono.ipros.com/public/product/image/2117111/IPROS17666030435834940385.jpg?w=280&h=280)
![[Market Research Report] Smart Solar Power Generation Market](https://image.mono.ipros.com/public/product/image/dcf/2001230399/IPROS07477931965920190391.png?w=280&h=280)



