[Case Study] Semiconductor Manufacturer in Japan
We respond to short delivery times! We provide integrated production from design to manufacturing and testing, including welding and machining, all in our own factory.
We would like to introduce a case where we manufactured a "rotary valve" for a semiconductor manufacturer that is currently constructing a new factory. The company required a specially designed rotary valve and needed to obtain it within three months due to project timelines. Our company was able to achieve a significantly compressed delivery schedule because we handle everything in-house, from design and manufacturing to verification, welding, and machining. We were able to deliver by the desired date. [Challenges] ■ A specially designed rotary valve was needed. ■ They consulted with a manufacturer they had previously worked with, but were told it would take six months for delivery. ■ Due to the timeline for the new factory, they needed to obtain it within three months. ■ Consulting with other manufacturers would mean starting from scratch, which would not meet the deadline. *For more details, please refer to the PDF document or feel free to contact us.
- Company:尾崎ウェルスチール 本社、機械加工工場、歌島工場、粉体工学研究所
- Price:Other