We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Subsidence correction work.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Subsidence correction work - List of Manufacturers, Suppliers, Companies and Products

Subsidence correction work Product List

31~45 item / All 61 items

Displayed results

[Construction Case] New Factory Established on Warehouse Site: Floor Slab Settlement Correction Work and Step Correction Work

Improving the cause of the step and puddle at the entrance of the old warehouse! Correcting without replacing the floor.

We would like to introduce a case of "floor sinking correction work and step correction work" conducted at the site of a former warehouse in a factory located in Chiba Prefecture. We considered using it as a new factory and adopted the Upcon method, which allows for corrections to be made in a short time without replacing the floor, and proceeded with the construction. Before the construction, there was a step of about 80mm at the factory entrance, but this was resolved after the work was completed. If you have any issues with the concrete floor in your factory, please feel free to contact us. 【Case Overview】 ■ Construction Area: 660m2 ■ Maximum Sinking Amount: Approximately 110mm ■ Area: Chiba Prefecture ■ Construction Period: 5 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Precision Machinery Factory: Floor Slab Settlement Correction Work

A case of correcting the subsidence, gaps, and voids under the factory's earthen floor in just two days during the factory's holiday!

We would like to introduce a case of "floor slab settlement correction work" and "void filling work under the floor slab" carried out at a precision machinery factory in Kagoshima Prefecture. There were voids and cavities of about 30 to 40 mm under the factory's floor slab, and due to the settlement of the floor along with the columnar improvements, a correction request was made to Upcon. The construction was completed over two days during the factory's holiday weekend. After the work was finished, we received a thank-you email from the customer stating, "It was successfully lifted, and we were moved." 【Case Overview】 ■ Construction Area: Approximately 480 m² ■ Maximum Settlement Amount: 41 mm ■ Maximum Void Amount: 35 mm ■ Area: Kagoshima Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Precision Parts Factory: Floor Slab Settlement Correction Work

Settlement of up to 50mm in the concrete floor! A case where the existing concrete floor was corrected in one day without breaking it.

We would like to introduce a case of "floor sinking correction work" conducted at a precision parts factory located in Shizuoka Prefecture. The factory's floor had sunk by a maximum of 50mm, with a correction area of approximately 81m2. The construction period was one day. The injection work was carried out while checking the height with a laser level, and after the resin injection, the filling confirmation was performed using a CCD camera. 【Case Overview】 ■ Construction Area: Approximately 81m2 ■ Maximum Sinking Amount: 50mm ■ Area: Shizuoka Prefecture ■ Construction Period: 1 Day *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Parts Assembly Factory: Floor Slab Settlement Correction Work

Due to the sinking of the floor, work was hindered! Here is an example of a case where corrections were made in a short period without stopping operations.

Here is an example of "floor sinking correction work" carried out at a parts assembly factory in Fukuoka Prefecture. Due to the sinking, the floor was slanted, making it difficult to adjust the jacks during conveyor assembly. As a result of the work, we were able to improve the situation to the point where assembly operations could be carried out smoothly. 【Case Overview】 ■Issue - The floor was slanted due to sinking, making it difficult to adjust the jacks during conveyor assembly. ■Result - The situation was improved to the point where assembly operations could be carried out smoothly. *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Food Factory 2nd Floor: Settlement Correction Work and Unevenness Correction Work

Correction of unevenness and settlement on a floor with a special structure! Resolving issues with cart operations caused by unevenness.

We would like to introduce a case of "settlement correction work and unevenness correction work" carried out on the second-floor slab of a food factory located in Kanagawa Prefecture. Unevenness occurred in the floor panels of the refrigerated room, causing issues with the movement of carts transporting goods, and the panels were being held down with anchors to suppress the unevenness. After the construction, the settlement in front of the entrance was resolved, and the floor panels' floating issue was also eliminated by filling the urethane layer with new urethane. 【Case Overview】 ■ Construction Area: 46.17m² ■ Maximum Settlement Amount: 42mm ■ Void Amount: 46.17 ■ Area: Kanagawa Prefecture ■ Construction Period: 4 days (including ancillary work) *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Factory: Ground Floor Settlement Correction Work

Materials and cargo are not stacking straight! Here are examples of how we corrected sinking and resolved issues.

Here is an example of "floor sinking correction work" carried out at a factory in Iwate Prefecture. At this factory, the floor had sunk due to ground subsidence, causing issues such as materials and cargo not stacking straight and forklifts being unable to access certain areas. The maximum subsidence was approximately 130mm, and the work was done over a large area of about 2000m2, completed in 16 days. 【Case Overview】 ■ Work Area: Approximately 2000m2 ■ Maximum Subsidence: Approximately 130mm ■ Maximum Void: Approximately 80mm ■ Area: Iwate Prefecture ■ Construction Period: 16 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Office/Parts Storage: Settlement Correction Work

No interruption in operations, correction of subsidence! Introducing a case where the floor level was adjusted and the gaps in the walls were improved.

We would like to introduce a case of "settlement correction work" carried out at the office and parts warehouse of an automobile manufacturer located in Hokkaido. In this company, the building had tilted due to settlement, causing issues with the opening and closing of doors and creating gaps in the ceiling. Therefore, the Upcon method was adopted because it could be implemented without stopping operations and within a short construction period. After the work was completed, the floor levels throughout the office and parts warehouse were corrected, and the gaps in the walls that had existed before the construction were also improved. 【Case Overview】 ■ Construction Area: 345m2 ■ Maximum Settlement: 63mm ■ Maximum Gap: 70mm ■ Area: Office of an automobile manufacturer located in Hokkaido ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Distribution Station: Floor Slab Settlement Correction / Underfloor Void Filling Work

Due to the extensive area of the modifications, the construction was carried out in several phases!

We would like to introduce a case of "floor sinking correction" and "underfloor void filling work" carried out at a distribution station of a product manufacturer located in Niigata Prefecture. Due to consolidation settlement, various areas within the station showed signs of sinking and sagging, prompting the adoption of the Upcon method, which allows for quick corrections. Since the area requiring correction was extensive, we utilized weekends during business shutdowns to divide the construction period and carry out the work. [Case Overview] ■ Construction Area: Approximately 1,460m2 ■ Maximum Settlement: 103mm ■ Maximum Void: 90mm ■ Area: Distribution station of a product manufacturer in Niigata Prefecture ■ Construction Period: 8 working days (Note: Construction was carried out in several phases) *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Large Product Storage Warehouse: Floor Slab Settlement Correction Work / Construction in 2010

Adopting the up-con method for short-term intensive repairs! Construction carried out to accommodate multiple plant vehicles.

We would like to introduce a case of "floor sinking correction work" conducted at a large product storage warehouse in Ibaraki Prefecture. Due to ground subsidence, the stacked cardboard boxes were leaning. For concentrated repairs over a short period, the Upcon method was adopted, and our company carried out the work with multiple plant vehicles. 【Case Overview】 ■ Construction Area: Approximately 2,000m2 ■ Maximum Subsidence: 110mm ■ Area: Large product storage warehouse in Ibaraki Prefecture ■ Construction Period: 6 days (Day 1: 4 vehicles, Days 2-6: 2 vehicles for construction) *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Void Filling Work for a Warehouse Handling Medical Equipment (Gifu Prefecture)

It is possible to correct subsidence in a short period without damaging the floor! Here are examples of corrections made without moving the cargo.

We would like to introduce a case where "void filling work" was carried out at a logistics warehouse handling medical supplies located in Gifu Prefecture. Due to ground subsidence, voids had formed under the floor, which were filled with polyurethane resin. Compared to traditional concrete replacement methods, this construction generates almost no dust or debris, allowing for work to be done without moving the cargo. 【Case Overview】 ■ Area: Gifu Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Supermarket: Floor Deflection Correction / Settlement Correction Work

Correction during nighttime while business is suspended! A case of correcting floor sagging due to ground subsidence in a short construction period.

We would like to introduce a case of "floor deflection correction" and "settlement correction work" carried out at a certain supermarket in Ibaraki Prefecture. The customer in this case was troubled by the floor inside the store being deflected due to settlement. Using the Upcon method, the work was conducted only at night, with minimal impact on business. The work was completed in a short period of two days without closing the store. 【Case Overview】 ■ Construction Area: Approximately 450m2 ■ Maximum Settlement Amount: Approximately 83mm ■ Area: Ibaraki Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Game Center: Earthquake Recovery Work / Floor Slab Settlement Correction Work

Due to the impact of the China-Vietnam earthquake, part of the floor inside the store has sunk! Case study of sinking correction work at a game center.

We would like to introduce a case where "disaster recovery construction" and "floor sinking correction work" were carried out at a game center located along a national highway in Niigata Prefecture. In this case, part of the floor inside the store sank due to the effects of the Chuetsu earthquake. As it was possible to correct the sinking in a short period, our company was requested to perform the sinking correction. The sinking was corrected using the Upcon method with rigid polyurethane foam. The construction was completed in one day. 【Case Overview】 ■ Area of sinking correction: Approximately 83m2 ■ Maximum sinking amount: -77mm ■ Planned correction value: Within 16mm ■ Area: Niigata Prefecture ■ Construction period: 1 day *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Drugstore: Settlement Repair Work (Niigata Prefecture)

Floor sagging due to ground subsidence! A case of straightening the floor before store renovation.

Here is a case study of "settlement correction work" conducted at a drugstore in Niigata Prefecture. In this case, the store's floor had sagged due to settlement. At the time of the store renovation, they wanted to correct the floor to make it level, and our Upcon method was adopted. The construction area was approximately 1500m2. Using the concrete replacement method, a project that typically takes one month was completed in just four days. (Settlement amount approximately 100mm) 【Case Overview】 ■ Construction Area: Approximately 1500m2 ■ Maximum Settlement Amount: Approximately 100mm ■ Area: Drugstore in Niigata Prefecture ■ Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Toy Retail Store / Electronics Retail Store: Earthquake Recovery / Floor Settlement Correction Work

Due to the impact of the Great East Japan Earthquake, the floor inside the store has significantly sunk! There have been cases where gaps have formed between the floor and the walls, as well as between the walls and the ceiling.

We would like to introduce a case of "earthquake recovery construction" and "floor subsidence correction work" carried out at a toy retail store and an electronics retail store in Fukushima Prefecture. Due to the impact of the Great East Japan Earthquake, the floor inside the toy retail store sank significantly. As a result of the floor subsidence, gaps were observed between the floor and walls, as well as between the walls and ceiling. Therefore, an up-con method that can be corrected during the night while the store is closed was adopted, and our company carried out the correction work. Additionally, since there were voids under the floor, we also implemented void filling work by injecting polyurethane resin into the gaps. 【Case Overview】 ■ Construction Area: Approximately 2,300m2 ■ Maximum Subsidence: 144mm ■ Area: Fukushima Prefecture ■ Construction Period: Continuous 11 nights (2012) *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Shopping Center: Subfloor Settlement Correction Work

Due to consolidation settlement, the floor has sunk over a wide area inside the store! A gap has occurred between the floor and the wall.

We would like to introduce a case of "subfloor sinking correction work" and "subfloor void filling work" carried out at a shopping center in Iwate Prefecture. Due to consolidation settlement, sinking was observed over a wide area of the floor. As a result of the floor sinking, gaps appeared between the floor and walls, causing various issues throughout the store. An Upcon method that could be corrected during the night while the store was closed was adopted, and our company performed the corrections. Additionally, since voids and cavities were also observed under the floor, void filling work using urethane was carried out as well. [Case Overview] ■ Construction Area: Approximately 540m² ■ Maximum Settlement Amount: 71mm ■ Maximum Void Amount: 190mm ■ Area: Iwate Prefecture ■ Construction Period: Continuous 7 nights *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Related Categories of Subsidence correction work