We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Subsidence correction work.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Subsidence correction work - List of Manufacturers, Suppliers, Companies and Products

Subsidence correction work Product List

16~30 item / All 61 items

Displayed results

[Construction Case] Slab Foundation House: Settlement Correction Work (Kawasaki City, Kanagawa Prefecture)

Possible to carry out without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.

We would like to introduce a case of "settlement repair work" carried out on a slab foundation house located in Kawasaki City, Kanagawa Prefecture. The homeowner, who purchased the house as a pre-built property, was deprived of a comfortable living environment due to the tilting of the house caused by ground subsidence. Several methods for settlement repair were considered, but the homeowner chose our company for the quick and non-disruptive repair without having to move. 【Case Overview】 ■ Maximum settlement amount: 107mm ■ Area: Kawasaki City, Kanagawa Prefecture ■ Construction period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work (Tokyo)

No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.

We would like to introduce a case of "settlement repair work" carried out on a slab foundation house located in Hachioji City, Tokyo. Due to a maximum settlement of 95mm observed, polyurethane resin was injected under the slab foundation to implement the settlement correction. If you are troubled by the tilting of your slab foundation house caused by earthquakes, liquefaction, or ground subsidence, please feel free to contact us. 【Case Overview】 ■ Construction Area: Approximately 43m2 ■ Maximum Settlement Amount: 95mm ■ Area: Hachioji City, Tokyo ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work (Kanagawa Prefecture)

Even in cases where the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.

We would like to introduce a case of "settlement correction work" carried out at a certain house with a flat foundation in Kanagawa Prefecture. Due to a maximum settlement of 66mm observed in one corner of the living room, polyurethane resin was injected under the flat foundation to implement the settlement correction. This time, the work was performed in a house with very limited space between neighboring properties, but our company can carry out the work without the need for extensive construction, allowing for a short construction period without affecting the neighboring property. 【Case Overview】 ■ Construction Area: 40m2 ■ Maximum Settlement Amount: 66mm ■ Area: Certain residence in Kanagawa Prefecture ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Disaster Recovery Concrete Pavement Slab Settlement Correction Work

Our method, which raises the CO pavement using the foaming pressure of rigid urethane resin, has been adopted!

We would like to introduce a case of "Disaster Recovery Concrete Pavement Slab Settlement Correction Work" conducted on the Route 4 Bypass in Koriyama City, Fukushima Prefecture. This was a restoration project for the CO pavement slabs of the Route 4 Koriyama Bypass, which were damaged and settled due to the Great East Japan Earthquake. Our method was adopted, which raises the still sound CO pavement slabs using the foaming pressure of rigid polyurethane resin, while keeping traffic restrictions limited to lane reduction during construction without replacing them. 【Case Overview】 ■ Construction Area: Approximately 2,430 m² ■ Area: Route 4 Bypass in Koriyama ■ Construction Period: 24 days (March 2013) ■ Client: Tohoku Regional Development Bureau, Koriyama Route Office *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Middle School (Gymnasium Floor): Settlement Correction and Void Filling Work

Due to the impact of the earthquake, the gymnasium floor has significantly sunk in a bowl shape! A case where the Upcon method was used to solve the problem.

We would like to introduce a case of "settlement correction and void filling work" carried out on the gymnasium floor of a junior high school in Fukushima Prefecture. Due to the effects of an earthquake, the floor had significantly sunk in a bowl shape from the outer edges towards the center, causing issues with the use of the gymnasium. The area that had sunk by a maximum of 108mm was corrected to within the planned value of -15mm, and it was confirmed using a CCD camera that the polyurethane resin was filled without any gaps, completing the work. [Case Overview] ■ Construction Area: 1,036m2 ■ Construction Period: 8 days ■ Maximum Settlement: 108mm ■ Area: Fukushima Prefecture *For more detailed information about the case, please refer to the related links. For further details, please check the PDF materials or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Elementary School: Floor Slab Settlement Correction Work

Utilizing spring break for quick subsidence correction! The cycle from construction to restoration is short.

Here is an example of "settlement correction" performed at an elementary school in Miyagi Prefecture. Due to floor settlement, gaps occurred between the classroom walls and ceiling, causing the classroom door to tilt and hindering the opening and closing of the lock. The overall floor level of the classroom and hallway was corrected from a maximum settlement of 69mm to within -18mm, and the gaps that had formed between the walls and ceiling before the work were also improved. 【Case Summary】 ■ Construction Area: 331m2 ■ Maximum Settlement: 69mm ■ Area: Tagajo City, Miyagi Prefecture / Elementary School ■ Construction Period: 4 days *For more detailed information about the case, please refer to the related link. For further details, please check the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TerraTech method for correcting tilts, subsidence, and level differences in floors and buildings: Case study collection giveaway.

We solve problems such as ground improvement and ground strengthening under buildings, mainly through settlement correction and void filling work using the Terra Tech method! We have surpassed 4,500 construction achievements.

●What is the Teratech Method… It is a patented method that involves injecting rigid polyurethane foam "Teratech resin" under concrete floors to fill voids and level sunken floors using its expansion force. Since it does not require breaking the floor, operations can continue without moving shelves or machinery! ▼Various issues we have resolved 【Tilt】 - Struggling with uneven factory floors. Want to make the concrete floor flat. - The warehouse floor has sunk in a bowl shape, causing vibrations during forklift operation. - The area where machines are installed has sunk, causing tilting of the machines. 【Subsidence】 - Found tilting in the foundation, making repairs impossible. - The concrete floor of the school gymnasium has sunk, except for the underground beams. - There are depressions on the warehouse floor, raising concerns about product storage and worker safety. 【Step Differences】 - There are step differences in the floor, causing product defects such as loads falling. - There is a step at the entrance of the refrigerated warehouse, making it difficult for forklifts to pass. 【Hollows and Gaps】 - The vibrations from the machines have worsened. I would like to check for any voids. - Cracks have appeared under the floor. We are struggling with corrosion of stored items and pest infestations. - Due to flooding, the soil under the concrete has been washed away, creating voids.

  • 画像1.png
  • 画像2.png
  • 画像3.png
  • 画像4.png
  • 画像5.png
  • 2.JPG
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Teratec Construction Report: Factory

Solving your factory problems! Introducing "TerraTech" case studies for subsidence correction and void filling.

We would like to introduce a case where problems caused by subsidence and voids in a factory were resolved by Teratech. [Problem] In a steel processing factory located in Ibaraki Prefecture, the concrete floor sank by about 3.4 cm. Although the factory had not been in operation for long, subsidence occurred, causing issues with the laser processing machine purchased for steel processing, which could no longer operate according to the specifications. For precision machines like laser processing machines, having a level floor is crucial for normal operation. [Reasons for Choosing Teratech] - Work can be carried out without stopping operations. - The work can be completed in a short time. [Feedback After Construction] "We were planning to readjust the level of the laser processing machine after this construction, but the floor correction was done so well beyond our expectations that the processing machine is now operating normally. We were very relieved that the planned budget of 1 million yen for the laser level adjustment was no longer necessary," we received words of gratitude. In addition, we also introduce resolution cases from packaging material manufacturing factories. *For more details, please refer to the external link page or feel free to contact us.

  • factory-02.jpg
  • factory-03.jpg
  • factory-04.jpg
  • factory-05.jpg
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Report: Hospital

Solving your concerns at the hospital! Introducing case studies of "Mainmark" for subsidence correction and void filling.

We would like to introduce a case that solved issues related to subsidence and cavities in a hospital. [Issues] A certain neurology clinic located in Sendai City was leaning, but as it is a comprehensive clinic equipped with both outpatient services and inpatient facilities, it operated almost 24 hours a day, 365 days a year. We received a request to carry out the construction without affecting the hospital's operations. [Feedback after Construction] Although it was a large-scale project, we successfully resolved the floor sagging and building subsidence in just two days of construction. The clinic resumed normal operations after the holiday, and the client was very satisfied. [Case Overview] ■ Comprehensive Clinic - Construction Details: Floor sagging and subsidence correction work - Construction Date: November 2013 - Location: Miyagi Prefecture - Construction Area: 900m² Other cases are also introduced on the following page: https://teretek.jp/plus/case/hospital *For more details, please refer to the external link page or feel free to contact us. Toll-Free Number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Warehouse and Factory in Sapporo City, Hokkaido

We would like to introduce a case where we made corrections in a short time without interrupting the customer's operations!

This is a case study of floor sinking correction work and void filling work conducted at a warehouse and factory located in Sapporo City, Hokkaido. Due to floor sinking, the racks used for storing goods had become tilted. As a temporary measure, spacers were used under the racks to adjust their height and level them. The sinking correction work was carried out in a limited space, and within a few hours, the floor was made flat. Additionally, sinking correction work was performed in the office without interrupting the customer's operations. [Case Study] ■ Total construction area: Approximately 334 m² ■ Maximum sinking amount: 105 mm ■ Construction period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other safety and hygiene products
  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Large Shopping Center: Correction of Sunken Concrete Floor

Correction made during the night while operations were suspended! A case where two construction plant vehicles were used to expedite the construction schedule.

A large shopping center experienced significant floor subsidence due to weak ground. Gaps were observed in various places, such as between the floor and walls and between the walls and ceiling, caused by the subsidence. As a result, our company implemented repairs. The "Upcon Method," which can be executed during nighttime while the business is closed, was adopted for the repairs. To expedite the construction period, two construction plant vehicles were utilized, and the repairs were completed over 25 nights. 【Construction Overview】 ■ Construction Area: Approximately 3,240m2 (Backyard 405m2, Inside Store 2,835m2) ■ Maximum Subsidence: 94mm ■ Repairs completed over 25 nights ■ Two construction plant vehicles used to expedite the construction period For more details, please feel free to contact us via PDF download or inquiry form.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Shopping Center (Iwate Prefecture): Subfloor Settlement Correction Work

Maximum settlement 71mm, maximum gap 190mm! Conducting polyurethane resin injection work while constantly checking the level!

A shopping center where widespread floor subsidence was observed due to ground subsidence. Due to the floor subsidence, gaps appeared between the floor and walls, causing various issues within the stores. As a result, our company implemented repairs. The "Upcon Method," which can be executed at night during the business closure, was adopted for the repairs. Additionally, since voids were also observed under the floor, filling work was carried out. 【Construction Overview】 ■ Construction Area: Approximately 540m² ■ Maximum Subsidence: 71mm ■ Maximum Void: 190mm ■ Construction completed in 2011, with repairs conducted over 7 consecutive nights. *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Bag Manufacturing Factory: Floor Slab Settlement Correction Work and Underfloor Void Filling Work

The machine's level cannot be secured, and spacers are being used. A malfunction has occurred in the machine, affecting product accuracy. This can be resolved with the up-con method.

This time, we will introduce a case study of a bag manufacturing factory in Miyagi Prefecture. Due to the impact of the Great East Japan Earthquake that occurred in March 2011, the floor sank, causing the machines to tilt and hindering production. The Upcon method was adopted because it allows for quick corrections without moving the machines. "We cannot secure the level of the machines and are using spacers." "Malfunctions have occurred in the machines, affecting product accuracy." We receive many inquiries about floor repairs like these at Upcon every day. The feature of the Upcon method is that it can correct floor subsidence in a short time, but another significant advantage is that it does not require the movement of machines or materials for construction. [Site Information] Miyagi Prefecture, Bag Manufacturing Factory Construction Area: Approximately 730 square meters Maximum Subsidence: 111mm Construction Period: 3 days For more details about the construction process, you can view it by downloading the PDF below.

  • Machinery and equipment installation/dismantling/relocation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Metal Processing Factory: Floor Slab Settlement Correction Work and Deflection Correction Work

A case where the floor of the corridor in the factory sagged and gaps appeared! Introducing an example of how it was fixed in one day without stopping operations.

We would like to introduce a case of "floor sinking correction work and deflection correction work" conducted at a metal processing factory in Fukuoka Prefecture. Due to ground subsidence over time, the floor of the corridor inside the factory sagged, creating gaps between the walls and the floor. To address the floor sagging and eliminate the gaps between the walls and the floor, subsidence correction work was carried out. After the work was completed, the areas that had sunk by up to 72mm, including the maximum subsidence location, were corrected to within management values, and the gaps that had formed between the walls and the floor due to subsidence were also eliminated. 【Case Overview】 ■ Construction Area: 114m2 ■ Construction Period: 1 day ■ Maximum Subsidence: 72mm ■ Area: Fukuoka Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Packaging Material Factory: Floor Slab Settlement Correction Work

To a factory that produces packaging materials such as cardboard! Introducing examples of subsidence correction work.

Here is an example of "floor sinking correction work" carried out at a packaging materials factory in South Korea. With ground subsidence, the concrete floor also sank, causing the stacked cardboard and other materials in the factory to tilt, which hindered operations. We performed polyurethane resin injection work, continuously checking the level while correcting the sinking. The correction was completed in 4 days with one construction plant vehicle. 【Case Overview】 ■ Construction Area: Approximately 360m2 ■ Location: Incheon, South Korea ■ Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Related Categories of Subsidence correction work