[Construction Case] Middle School (Gymnasium Floor): Settlement Correction and Void Filling Work
Due to the impact of the earthquake, the gymnasium floor has significantly sunk in a bowl shape! A case where the Upcon method was used to solve the problem.
We would like to introduce a case of "settlement correction and void filling work" carried out on the gymnasium floor of a junior high school in Fukushima Prefecture. Due to the effects of an earthquake, the floor had significantly sunk in a bowl shape from the outer edges towards the center, causing issues with the use of the gymnasium. The area that had sunk by a maximum of 108mm was corrected to within the planned value of -15mm, and it was confirmed using a CCD camera that the polyurethane resin was filled without any gaps, completing the work. [Case Overview] ■ Construction Area: 1,036m2 ■ Construction Period: 8 days ■ Maximum Settlement: 108mm ■ Area: Fukushima Prefecture *For more detailed information about the case, please refer to the related links. For further details, please check the PDF materials or feel free to contact us.
Inquire About This Product
basic information
*The detailed information about the case can be viewed through the related link. For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
*The details of the case can be viewed through the related links. For more information, please refer to the PDF document or feel free to contact us.*
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.