Solving your factory problems! Introducing "TerraTech" case studies for subsidence correction and void filling.
We would like to introduce a case where problems caused by subsidence and voids in a factory were resolved by Teratech. [Problem] In a steel processing factory located in Ibaraki Prefecture, the concrete floor sank by about 3.4 cm. Although the factory had not been in operation for long, subsidence occurred, causing issues with the laser processing machine purchased for steel processing, which could no longer operate according to the specifications. For precision machines like laser processing machines, having a level floor is crucial for normal operation. [Reasons for Choosing Teratech] - Work can be carried out without stopping operations. - The work can be completed in a short time. [Feedback After Construction] "We were planning to readjust the level of the laser processing machine after this construction, but the floor correction was done so well beyond our expectations that the processing machine is now operating normally. We were very relieved that the planned budget of 1 million yen for the laser level adjustment was no longer necessary," we received words of gratitude. In addition, we also introduce resolution cases from packaging material manufacturing factories. *For more details, please refer to the external link page or feel free to contact us.
Inquire About This Product
Related Videos
basic information
【Case Studies】 ■ Steel Processing Factory - Construction Details: Settlement Correction Work - Construction Date: July 2016 - Location: Ibaraki Prefecture - Construction Area: 193 m² ■ Packaging Material Manufacturing Factory - Construction Details: Filling of Void Under Concrete Floor (Disaster Recovery) Work - Construction Date: January 2017 - Location: Kumamoto Prefecture - Construction Area: 1,792 m² *For more details, please refer to the external link page or feel free to contact us. Toll-Free Number: 0120-873-835
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the external link page or feel free to contact us. Toll-free number: 0120-873-835
catalog(4)
Download All Catalogs![[Inclination/Subsidence/Step Difference/Cavity Filling] "TerraTech Method" Correction of subsidence in concrete floor slabs due to ground subsidence or disasters.](https://image.mono.ipros.com/public/catalog/image/01/494/209281/IPROS62099550671294161372.png?w=120&h=170)
News about this product(7)
Company information
The main business activities of Mainmark involve "returning tilted floors and buildings to a level state" and "preventing existing floors and buildings from tilting." We primarily offer the "TerraTech Method," which allows us to level tilted floors without stopping operations, and we provide various construction proposals tailored to our customers' concerns, from investigation to execution. ■ Nationwide responsible construction with over 5,000 completed projects Mainmark has established offices in eight locations across the country and conducts responsible construction nationwide. We serve a wide range of clients, including factories, stores, warehouses, offices, and apartments. ■ Non-disruptive floor tilt and subsidence correction method "TerraTech Method" Our main service, the "TerraTech Method," is a patented technique that injects TerraTech resin (rigid polyurethane foam resin) into concrete floors that have developed tilts, subsidence, steps, or voids due to ground subsidence or earthquakes. The expansion force of the resin levels the sunken floor and fills the voids beneath it. This technology is also registered with the Ministry of Land, Infrastructure, Transport and Tourism's "NETIS," ensuring its reliability. Patent No. 4896949 "Method for Correcting Sunken Floors" NETIS Registration No. "QS-080007"