We have published examples of the construction work for the sinking correction project.
 メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡
                    メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡
                  We have newly published a case study on our service site for the Teratec method.
This is a case of settlement correction work carried out at an electronics retail store in Shiga Prefecture. There were concerns about the sagging of the store floor due to ground subsidence, and we were consulted by the company.
We understand that our Teratec method was chosen because it allows for construction without interrupting daily operations. Additionally, the positive feedback from a previous project was also a key point.
Our company has extensive experience in settlement measures and void filling work while maintaining daily operations for stores and factories. With eight offices nationwide, we are ready to assist you, so please feel free to contact us if you are facing issues with ground subsidence or voids under your floors.
■ Case Study (Teratec Method Service Site):
https://teretek.jp/repo/r181
                  
- Inquiry about this news Contact Us Online
- More Details & Registration Details & Registration
Related Links
Related product
Related catalog(12)
![[Inclination/Subsidence/Step Difference/Cavity Filling] "TerraTech Method" Correction of subsidence in concrete floor slabs due to ground subsidence or disasters.](https://image.mono.ipros.com/public/catalog/image/01/494/209281/IPROS62099550671294161372.png?w=120&h=170) 
                            
                          Distributors
                        Building materials, supplies and fixtures
                        
                      メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡
                      
                                            
                    























 
                            
                           
                            
                          ![[Construction Case] Funabori Co., Ltd. (Manufacturing Factory) "Teratech Method"](https://image.mono.ipros.com/public/catalog/image/01/cc9/492298/IPROS52834423859237658082.png?w=120&h=170) 
                            
                           
                            
                           
                            
                           
                            
                          ![[Guarantee] Overview document for the 10-year warranty service "Teratec Plus 10"](https://image.mono.ipros.com/public/catalog/image/01/9a3/400056/IPROS41445067320010028371.jpeg?w=120&h=170) 
                            
                           
                            
                          ![[Case Studies of Safety Measures] Leveling a Tilted Floor in a Short Time! Teratec Method](https://image.mono.ipros.com/public/catalog/image/01/437/284097/IPROS61996475119819210519.jpeg?w=120&h=170) 
                            
                           
                            
                           
                        
                      



