The first step in warehouse automation is the "Terra Tech Method" from the level of the floor.
TerraTech Method
Currently, with the advancement of delivery management and warehouse automation utilizing AI and big data, the levelness of the facility's floor is an important theme for the introduction of automation equipment.
If the floor is not level... ☑ The installation of high-rise racks will require liner support, causing anxiety! ☑ There is a possibility that high-pick operators may fall, making it unusable! ☑ There may be obstacles to the operation of AGVs (automated guided vehicles)! ☑ High stacking of pallets and nestainers may become tilted and impossible! The "TerraTech Method" levels the floor's tilt and subsidence in a short construction period. ◆ What is the TerraTech Method? Is your warehouse's concrete floor tilted or sunken? The TerraTech Method involves injecting TerraTech resin beneath the concrete floor, using its expansion force to return the sunken floor to level and fill any voids underneath. This patented method corrects the "tilt," "sinking," "steps," and "deflection" of the concrete floor without damaging it, and does so in a short period. Please feel free to contact us. Toll-free number: 0120-873-835
Inquire About This Product
Related Videos
basic information
◆Features of the Teratec Method - Does not damage the floor - Short construction period - Patent obtained - Over 4,200 construction achievements In traditional floor replacement or addition, the construction period for introducing automated equipment takes 30 days, but with the Teratec method, it only takes 1 day! Achieving significant reduction in construction time! If you are troubled by a sloping floor, please contact us immediately. We will respond promptly. Toll-free number: 0120-873-835
Price information
It varies depending on the sinking amount and the cavity amount. Please feel free to contact us.
Delivery Time
P1
※First, we will conduct an investigation: measuring the floor's tilt and surveying the amount of voids under the floor.
Applications/Examples of results
【Main Construction Sites】 Stores: Shopping centers, large retail stores, convenience stores, pachinko parlors, restaurants Warehouses: General warehouses, distribution centers, logistics hubs, cold storage warehouses, platforms Factories: Various manufacturing plants, food factories, cold rooms, inspection rooms Schools: Classrooms, gymnasiums, auditoriums, kitchens Public Works: Roads, pedestrian bridges, various airport facilities, schools, community centers 【Main Clients】 ▼ Government Agencies Kanto Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Chubu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Kinki Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Chugoku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Kyushu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Hokuriku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Tokyo Aviation Bureau, Ministry of Land, Infrastructure, Transport and Tourism Tokyo Metropolitan Government, First Construction Office Iwate Prefecture, Department of Land Development Aomori Prefecture, Shimokita Regional Bureau Kyoto Prefecture, Civil Engineering Office Chiba Prefecture, Sewerage Corporation ▼ Private Companies Obayashi Corporation Kajima Corporation Taisei Corporation Takenaka Corporation Shimizu Corporation Daiwa House Industry Co., Ltd. Toda Corporation Mitsui Sumitomo Construction Co., Ltd. Ando & Associates Tokyu Construction Co., Ltd. Goyo Construction Co., Ltd. Maeda Corporation Fujita Corporation Nishimatsu Construction Co., Ltd. NIPPO Corporation
Line up(1)
Model number | overview |
---|---|
001 | Teratech Method: Floor and building subsidence correction work caused by ground subsidence |
catalog(7)
Download All Catalogs![[Inclination/Subsidence/Step Difference/Cavity Filling] "TerraTech Method" Correction of subsidence in concrete floor slabs due to ground subsidence or disasters.](https://image.mono.ipros.com/public/catalog/image/01/494/209281/IPROS62099550671294161372.png?w=120&h=170)
News about this product(7)
Company information
The main business activities of Mainmark involve "returning tilted floors and buildings to a level state" and "preventing existing floors and buildings from tilting." We primarily offer the "TerraTech Method," which allows us to level tilted floors without stopping operations, and we provide various construction proposals tailored to our customers' concerns, from investigation to execution. ■ Nationwide responsible construction with over 5,000 completed projects Mainmark has established offices in eight locations across the country and conducts responsible construction nationwide. We serve a wide range of clients, including factories, stores, warehouses, offices, and apartments. ■ Non-disruptive floor tilt and subsidence correction method "TerraTech Method" Our main service, the "TerraTech Method," is a patented technique that injects TerraTech resin (rigid polyurethane foam resin) into concrete floors that have developed tilts, subsidence, steps, or voids due to ground subsidence or earthquakes. The expansion force of the resin levels the sunken floor and fills the voids beneath it. This technology is also registered with the Ministry of Land, Infrastructure, Transport and Tourism's "NETIS," ensuring its reliability. Patent No. 4896949 "Method for Correcting Sunken Floors" NETIS Registration No. "QS-080007"