Achieve the levelness of floors necessary for factory and warehouse automation! 'TerraTech Method'
TerraTech method
The first step in automating factories and warehouses starts with the level of the floor. You can rely on us for issues related to floor tilt and subsidence.
The "Teratec Method" is a technique for leveling floors that have tilted or settled in a short construction period. In the current era where AI and big data are advancing in delivery management and the automation of factories and warehouses, the leveling of facility floors is an important theme for the introduction of automated equipment. We solve concerns such as: - "The installation of high racks has become unstable for liner compatibility." - "There is a risk of the high-pick work vehicle tipping over, making it unusable." - "The stacking of pallets and nestainers is becoming tilted and cannot be done." 【Features】 - Does not damage the floor - Short construction period - Patent obtained - Over 4,200 construction achievements *For more details, please refer to the PDF materials or feel free to contact us. Toll-free number: 0120-873-835
Inquire About This Product
Related Videos
basic information
【Solving Such Concerns】 ■ Installation of high racks is now liner-compatible, causing anxiety ■ There is a possibility that the high-pick work vehicle may tip over and cannot be used ■ There may be obstacles to the operation of AGVs (automated guided vehicles) ■ High stacking of pallets and nestainers is becoming unstable and cannot be done *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835
Price information
After investigating the sinking volume and cavity volume, we will provide a design estimate. The inspection will be conducted free of charge, so please feel free to consult with us.
Delivery Time
Applications/Examples of results
**Main Construction Sites** Stores: Shopping centers, large retail stores, convenience stores, pachinko parlors, restaurants Warehouses: General warehouses, distribution centers, logistics hubs, cold storage, platforms Factories: Various manufacturing plants, food factories, cold rooms, inspection rooms Schools: Classrooms, gymnasiums, auditoriums, cafeterias Public Works: Roads, pedestrian bridges, various airport facilities, schools, community centers **Main Clients** ▼ Government Agencies Kanto Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Chubu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Kinki Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Chugoku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Kyushu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Hokuriku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Tokyo Aviation Bureau, Ministry of Land, Infrastructure, Transport and Tourism Tokyo Metropolitan Government, First Construction Office Iwate Prefecture, Department of Land Development Aomori Prefecture, Shimokita Regional Citizens Bureau Kyoto Prefecture, Civil Engineering Office Chiba Prefecture, Sewerage Public Corporation ▼ Private Companies Obayashi Corporation Kajima Corporation Taisei Corporation Takenaka Corporation Shimizu Corporation Daiwa House Industry Co., Ltd. TODA Corporation Mitsui Sumitomo Construction Co., Ltd. Ando & Associates, Inc. Tokyu Construction Co., Ltd. Goyo Construction Co., Ltd. Maeda Corporation Fujita Corporation Nishimatsu Construction Co., Ltd. NIPPO Corporation
catalog(4)
Download All Catalogs![[Inclination/Subsidence/Step Difference/Cavity Filling] "TerraTech Method" Correction of subsidence in concrete floor slabs due to ground subsidence or disasters.](https://image.mono.ipros.com/public/catalog/image/01/494/209281/IPROS62099550671294161372.png?w=120&h=170)
News about this product(7)
Company information
The main business activities of Mainmark involve "returning tilted floors and buildings to a level state" and "preventing existing floors and buildings from tilting." We primarily offer the "TerraTech Method," which allows us to level tilted floors without stopping operations, and we provide various construction proposals tailored to our customers' concerns, from investigation to execution. ■ Nationwide responsible construction with over 5,000 completed projects Mainmark has established offices in eight locations across the country and conducts responsible construction nationwide. We serve a wide range of clients, including factories, stores, warehouses, offices, and apartments. ■ Non-disruptive floor tilt and subsidence correction method "TerraTech Method" Our main service, the "TerraTech Method," is a patented technique that injects TerraTech resin (rigid polyurethane foam resin) into concrete floors that have developed tilts, subsidence, steps, or voids due to ground subsidence or earthquakes. The expansion force of the resin levels the sunken floor and fills the voids beneath it. This technology is also registered with the Ministry of Land, Infrastructure, Transport and Tourism's "NETIS," ensuring its reliability. Patent No. 4896949 "Method for Correcting Sunken Floors" NETIS Registration No. "QS-080007"