[Construction Case] Slab Foundation House: Settlement Correction Work (Kanagawa Prefecture)
Even in cases where the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.
We would like to introduce a case of "settlement correction work" carried out at a certain house with a flat foundation in Kanagawa Prefecture. Due to a maximum settlement of 66mm observed in one corner of the living room, polyurethane resin was injected under the flat foundation to implement the settlement correction. This time, the work was performed in a house with very limited space between neighboring properties, but our company can carry out the work without the need for extensive construction, allowing for a short construction period without affecting the neighboring property. 【Case Overview】 ■ Construction Area: 40m2 ■ Maximum Settlement Amount: 66mm ■ Area: Certain residence in Kanagawa Prefecture ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.