[Construction Example] Warehouse and Factory in Sapporo City, Hokkaido
We would like to introduce a case where we made corrections in a short time without interrupting the customer's operations!
This is a case study of floor sinking correction work and void filling work conducted at a warehouse and factory located in Sapporo City, Hokkaido. Due to floor sinking, the racks used for storing goods had become tilted. As a temporary measure, spacers were used under the racks to adjust their height and level them. The sinking correction work was carried out in a limited space, and within a few hours, the floor was made flat. Additionally, sinking correction work was performed in the office without interrupting the customer's operations. [Case Study] ■ Total construction area: Approximately 334 m² ■ Maximum sinking amount: 105 mm ■ Construction period: 3 days *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.