[Case Study] Power Monitoring at a Ready-Mix Concrete Plant! The First Step Towards Reducing Electricity Costs
We recommend the installation of wireless devices and TWPM for customers who want to monitor the power consumption of each machine!
The customer was responsible for the accounting of a ready-mixed concrete factory and was troubled by not knowing the monthly electricity costs, how much power was consumed by the operation of each piece of equipment, and which equipment's operation could be reduced to lower electricity costs. Since it was the first time monitoring electricity at a ready-mixed concrete factory, we visited with a technician from our instrumentation department. We installed the demand monitoring device "CSA-109-T" and the demand display "CSA-109-D2" to allow them to check real-time power usage. After that, we proposed a method to automate power monitoring for each piece of equipment by installing "LoRa wireless devices" and "TWPM." [Case Overview] ■ Issues - How much power is consumed by the operation of each piece of equipment - Which equipment's operation can be reduced to lower electricity costs ■ Proposal: LoRa wireless devices, TWPM *For more details, please refer to the PDF document or feel free to contact us.
- Company:ハカルプラス
- Price:Other