The factory wastewater treatment has a high load of BOD and oil content, but it cannot be expanded immediately.
We can provide cost-effective proposals such as temporary measures and partial equipment enhancements in the current state of wastewater treatment.
In food factories, the load can increase due to the production items and increased production, necessitating the acceptance and treatment of inflow water from the factory. To maintain the quality of the discharged water, emergency measures may also be required. For example: (1) Consideration of the use of coagulants and microbial materials (2) Temporary installation of aeration diffusers (3) Confirmation of the overall capacity of wastewater treatment equipment (capacity confirmation is possible regardless of the equipment manufacturer; if there is insufficient capacity, selection and proposals can be made) (4) On-site maintenance visits and maintenance responses through communication, etc. [Response Examples] - Projects constructed by other companies - Maintenance projects by other companies *For more details, please download the PDF or feel free to contact us.*
- Company:ビオメンテナンス 本社
- Price:Other