Red Water Countermeasures (13 Years After Construction, 30 Households) [Magnetic Water Treatment Device Vol. 6]
Adopting an independent circulation system! Installing PI-25CF (3-piece set) in a 13-year-old, 30-unit apartment building.
We would like to introduce a case of red water countermeasures implemented at East Side Palace T&T (a 30-unit condominium built 13 years ago) by Testa Corporation. We installed the PI-25CF (3-point set). We adopted an independent circulation method that extracts water from the suction side of the pump, processes it through a polar treatment, and then feeds it into the water tank via a blow pipe. [Case Details] - Installation Location: East Side Palace T&T, Testa Corporation - Installation Date: August 26, 2002 - Installation Time: Approximately 5 hours; no water outage due to the presence of an elevated water tank - Polar Model: PI-25CF (3-point set) *For more details, please refer to the PDF document or feel free to contact us.
- Company:日本セルポ
- Price:Other