Type I Pressure Vessel Maintenance and Performance Testing
Inspections by the Prefectural Labor Bureau and others are mandatory at each stage, including manufacturing, importing, and installation!
We provide maintenance and performance testing for Class 1 pressure vessels. In maintenance, we carry out open maintenance of boiler flue tubes, open maintenance of safety valves, and pressure settings. Additionally, performance testing is generally conducted with the Class 1 pressure vessels opened, so prior to the performance test, we will perform internal cleaning and disassembly of accessories as part of the open maintenance. Please feel free to contact us when you need our services. 【Maintenance Contents (Partial)】 1. Removal of accessories 2. Internal cleaning of the vessel 3. Cleaning of cover plates, etc. 4. Disassembly and maintenance of safety valves 5. Pressure setting of safety valves *For more details, please download the PDF or feel free to contact us.
- Company:トリイ
- Price:Other