We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for BIM software.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

BIM software Product List and Ranking from 7 Manufacturers, Suppliers and Companies | IPROS GMS

Last Updated: Aggregation Period:Jan 21, 2026~Feb 17, 2026
This ranking is based on the number of page views on our site.

BIM software Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jan 21, 2026~Feb 17, 2026
This ranking is based on the number of page views on our site.

  1. トリンブル・ソリューションズ Tokyo//software
  2. SB C&S Tokyo//IT/Telecommunications
  3. グラフィソフトジャパン Tokyo//software
  4. 4 図研アルファテック Kanagawa//CAD/CAM
  5. 5 STUDIO55 Tokyo//IT/Telecommunications

BIM software Product ranking

Last Updated: Aggregation Period:Jan 21, 2026~Feb 17, 2026
This ranking is based on the number of page views on our site.

  1. [BIM Software Implementation Case Study] Pasila District Development Project トリンブル・ソリューションズ
  2. [BIM Software Implementation Case] Blue Lock Quarry トリンブル・ソリューションズ
  3. BIM Software [Revit] User Case Vol. 9 SB C&S
  4. [BIM Software Implementation Case] HelsinkiGramofoni トリンブル・ソリューションズ
  5. Archicad User Case Studies Vol. 016 グラフィソフトジャパン

BIM software Product List

31~57 item / All 57 items

Displayed results

STUDIO55 Co., Ltd. Company Profile

Seize the future that is right in front of you! We will support you in bringing out your design.

STUDIO55 Co., Ltd. is a special team specializing in CG, VR, BIM, point cloud data, software, design support, and metaverse production. We provide valuable services that leverage the high technical skills of Asia's knowledge workers and the large scale of our production system, firmly gripped by Japanese design management. We realize our clients' visions of "visualizing design data," "visualizing construction and architectural data," and "visualizing virtual reality" = the metaverse. 【Business Contents】 ■ VR (Virtual Reality) ■ VR office ■ CG animation ■ BIM and point clouds ■ Perspectives ■ Original metaverse construction ■ Various software sales *For more details, please refer to the PDF document or feel free to contact us.

  • Other CAD related software
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Various learning programs

Graphsoft confidently recommends its own developed various learning programs.

At Graphisoft, we offer various schools and training programs to help you utilize BIM. ■BIM Classes: An online school developed by Graphisoft where you can learn about various topics related to Graphisoft products and related products. We provide a wide range of courses from beginner to advanced levels. By taking courses step by step from the beginner level, you can achieve a solid improvement in your skills. ■BIM Classes Solibri Plan: A plan organized to allow you to take only the classes necessary for utilizing Solibri Office, in order to gain a deeper understanding of Solibri's features. ■BIM Manager Program: A 10-week online training program for those currently working as BIM Managers/BIM Coordinators or those aspiring to become one.

  • Other CAD related software
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM "Archicad" for small-scale design offices and individual designers.

Improving productivity and reducing mistakes! BIM for small design firms and individual designers to simplify communication with clients and enhance competitiveness.

"Archicad Studio" is a subscription plan for small design firms and individual designers that allows access to the main features of Archicad at an affordable price. Collaborate with local teams using BIMcloud Basic and impress clients with the excellent 3D walkthrough presentations of BIMx Pro. Additionally, transition from 2D CAD to 3D BIM models, automatically updating models and drawings simultaneously. 【Features】 ■ Increased productivity and reduced errors ■ Local teamwork > Collaboration is primarily through a local server (on-premises), but by purchasing a BIMcloud SaaS subscription license, you can also benefit from cloud-based backup data while performing collaborative work. ■ Shortened review cycles ■ Simplified communication with clients, enhancing competitiveness ■ Strengthened collaboration between different teams ■ Support for professional growth *For more details, please download the PDF or feel free to contact us.

  • Other CAD related software
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Stadium Renovation Project

Transmitting vertical loads to two linked pendulums! Introducing a case where circulation within the stadium has improved!

We would like to introduce a case study on the introduction of BIM software for the Santiago Bernabéu Stadium renovation project. The new fixed roof, which uses over 9,000 tons of steel, consists of two trusses spanning 177 meters in length and four cross trusses measuring 144 meters in length. This roof is retractable and splits into two panels that slide over the inner cross trusses. The panels are made up of five air-inflatable cushions measuring 72×7 meters, positioned between six steel hybrid trusses with a span of 72.5 meters. Additionally, during the assembly process, the main truss, which served as a guide for the other trusses, transmits vertical loads to two new evacuation towers on the west side and two linked pendulums integrated into the building on the east side, while completely isolating horizontal loads from the existing structure. The redevelopment of the stadium also includes the installation of a video scoreboard. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Offshore Platform

We will introduce a case where the use of advanced tools successfully achieved an efficient design process!

The "Azeri Central East (ACE) Project" has become the second largest and most important project for AZFEN. By utilizing advanced tools of Tekla software, such as custom components (streamlining customizable modeling features), templates, and macros, the project has successfully achieved an efficient design process. The project focuses on the production and drilling at the new 48-slot site, as well as a distribution platform located at a depth of 140 meters between the existing Central Azeri and East Azeri platforms. Additionally, the project includes an infield pipeline that transports oil and gas from the ACE platform to the existing ACE Phase 2 transportation pipeline. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] AFAS Stadium

An example of minimizing miscommunication and work-related errors!

In August 2019, part of the roof of the Morenaar Stand at AFAS Stadium collapsed due to strong winds. Fortunately, there were no matches taking place, and no injuries were reported, but the damage was significant. There was a design flaw in the structural joints, with insufficient thickness in the welds, and damage from strong winds experienced in the past contributed to the collapse. At the end of 2019, ASK Romein was selected for the design and structural engineering, and they began collaborating with BAM Bouw en Techniek. BIM was maximally utilized throughout the engineering process, enabling clear communication among project stakeholders and seamless interaction between different software. Since there are many points of contact between the existing structure and the new structure, point cloud data measured with a 3D scanner is being used in the engineering and assembly processes. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Pepper Tree Quarry

Conducted 3D laser scanning and integrated it as a point cloud on the reconstructed Tekla model!

In 2013, Sandvik received a project from their client Boral for a quarry located in Pepper Tree. The factory, located in Sydney, Australia, is equipped with six crushers, nine screening machines (vibrating screens), a conveyor belt approximately 3.4 km long, and a fully automated loading system. This project was one of the more complex ones undertaken by the company. The main challenge was integrating the complex new equipment into the existing factory, which had not been designed for it, and not all existing blueprints were available. By importing from other applications, utilizing past Tekla models, and performing rough modeling of the remaining parts, a complete three-dimensional model of the factory was reconstructed in "Tekla Structure" using the existing model and drawing information. Scanning the existing factory with Trimble's 3D laser scanner made it possible to compare the model with the actual factory, serving as the foundation for the design of the new equipment. *For more details, please feel free to contact us. ⇩ The catalog can be downloaded from the special website below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Steel Structural Design of Waste Heat Recovery Boiler

The top part has an external platform with access to the chimney platform!

In the project for the steel structure design of the boiler building and the work and inspection platform for the waste heat recovery boiler implemented in Kazinbarcika, Hungary, we have carried out the basic design, detailed design, and creation of documentation for the structure. We undertook the basic design of the boiler building, detailed design including the outer walls, external stairs, and joints of the platform, as well as the creation of documentation for manufacturing. The main platform is equipped with grating, and there are stairs and ladders installed between each platform for movement routes. The entire structure is painted, with only the grating and stair steps galvanized, and the weight of the steel frame is 150 tons. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] New National Football Stadium in Slovakia

The stability of the roof structure of the entire stand is ensured by braces arranged in a truss pattern!

The new national soccer stadium, "Tehelné Pole Stadium," is a project with the largest investment level in the modernization of Slovakia's soccer stadiums to date. The new stadium is being built on the site of the old Tehelné Pole Stadium, maintaining the surrounding environment. The stands feature a cantilever roof made of membrane structure, a cutting-edge technique, which covers the entire stand to provide shade and protect against inclement weather. This cantilever roof is composed of a truss structure, with individual components supported by reinforced concrete foundations. The construction of this new stadium has become a unique and highly challenging project in terms of its distinctive shape and structural complexity. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 3D CAD
  • Modeler
  • 2D CAD Construction
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] HelsinkiGramofoni

Eliminate mistakes and unnecessary waste! You can easily visualize usable locations in a spot!

Helsinki Gramofoni is a residential building made of precast concrete structures, supported by a footing foundation on a 5/6-story ground. The construction company Skanska has begun to realize that models from a different design sector are very useful. For example, "Tekla Structures" was used for site management and schedule management. "The company was seeking reliable construction management and effective schedule management, as well as a way to eliminate inconsistencies and mistakes from design. Building Information Modeling provides undeniable benefits in this regard," said the company's development director. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special site below⇩

  • 3D CAD
  • 2D CAD Construction
  • Modeler
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Stadium (Sochi, Russia)

We would like to introduce a case where a massive curved roof structure was realized using Tekla!

Inspired by the Easter egg of a Russian jeweler, the stadium designed features integrated walls and a roof that shine in the sunlight, attracting attention as a beautiful stage. The stadium is a steel structure with a gently curved, massive shape, requiring advanced technology for calculations of beam nodes and dimensions of joints with the basic structure. Additionally, during the modeling process, Mostproekt discovered that the size of the joint components posed transportation issues and conducted simulations on the Tekla model to create alternatives. As a result, by manufacturing products that consider shipping conditions, potential troubles were prevented. "Tekla Structures" played a significant role in solving such issues. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

  • 3D CAD
  • 2D CAD Construction
  • Modeler
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Guacolda Coal-Fired Power Generation Facility

Introducing examples of overcoming communication barriers such as time differences, distance, and different languages!

We would like to introduce the construction of coal-fired power generation facilities in the Republic of Chile, South America, which Mitsubishi Heavy Industries, Ltd. received an order for in 2006. Chile, the manufacturing site, is located exactly on the opposite side of the Earth from Japan. The time difference, geographical distance, and different languages pose significant obstacles to information communication in design, manufacturing operations, and their process management. To address this, the company utilized "Tekla Structures" to accumulate and manage all information from design to manufacturing within a single 3D model. By doing so, they maintained consistency of information between the design site in Japan and the manufacturing site in Chile, aiming to reduce rework and inconsistencies in design and manufacturing operations. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • Software (middle, driver, security, etc.)
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Brominmaki Wastewater Treatment Facility

Structural design is carried out entirely based on BIM! We will introduce a case that achieved the management of a vast amount of data.

The new wastewater treatment facility being constructed in Blominmäki, Espoo, Finland, has a high processing capacity and can remove 99% of phosphorus from water. This facility, which has buildings and storage tanks installed on a site of over 10 hectares, utilizes Nordic construction methods for underground excavation. The project is diverse and presents many challenges, while also featuring a very interesting design. The biggest challenge has been managing the vast amount of data handled in the project. The design employs numerous modeling software, including "Tekla Structures" and "Trimble Connect." Additionally, all structural design is carried out based on BIM and is modeled in greater detail than the level of detail (LOD) specified by Finland's COBIM. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Tripla Project

Expanding the scope of BIM application and demonstrating its effectiveness in various processes! Case studies from large-scale construction sites.

The development project of Tripla, located in the center of Pasila, Helsinki, the capital of Finland, utilizes BIM tools for various design tasks. The project's procurement team efficiently calculates quantities of construction materials by leveraging the BIM model. "Tekla Structures" allows for the aggregation and classification of cost estimation information under various conditions, enabling the visualization of costs at detailed levels, such as by work process or contractor, which aids in accurately understanding estimated prices. Additionally, the Tekla model has achieved significant results in examining the feasibility of construction, such as investigating the delivery routes for escalators to be installed within the building. [Case Overview] ■ Implementation Site: Tripla Project (Helsinki, Finland) *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special site below⇩

  • 3D CAD
  • 2D CAD Construction
  • antenna
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] 2020 Dubai International Expo

Easily coordinate with other stakeholders! Here is an example of how we solved challenges with "Tekla Structures."

We would like to introduce a case study of BIM software implementation at the "2020 Dubai International Expo Mobility Pavilion." In this project, Tiger Steel was responsible for everything from the detailed design and fabrication of the steel structure, including the examination of joints, to construction. The three-dimensional structure and complex joints were very challenging, but this was resolved by using "Tekla Structures." The biggest advantage of using this software is that it makes coordination with other stakeholders easier. [Case Overview] ■ Challenge: The three-dimensional structure and complex joints were very difficult. ■ Result: This was resolved by using Tekla Structures. ■ Benefit: Coordination with other stakeholders became easier. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Maren Corporation's Circulating Fluidized Bed Boiler

Improvement in detailed design of joints through modeling! A case where design errors were minimized.

We would like to introduce a case study on the implementation of BIM software in the design of Maren's Circulating Fluidized Bed (CFB) boiler. In this project, the use of "Tekla Structures" was essential for coordinating and adapting various piping and structural designs across different sections. Tasks were allocated early in the bidding phase, and effective detailed design of joints allowed for quick generation of drawings, minimizing design errors. At the points where structural steel components connect to the plant piping supports, structural members either converted IFC data to raw data of the same product or referenced IFC as information to be displayed in product drawings for verification. High-level detailed design has led to zero errors. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • 3D CAD
  • Other CAD related software
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Six Things to Check When Introducing BIM" Basic Knowledge Materials Provided!

A must-read before introducing new BIM or replacing existing ones! A compilation of checkpoints to consider for selecting the appropriate BIM solution!

Choosing which BIM software to select is a very important factor related to a company's competitiveness. There are many points to consider when selecting a BIM solution and many things to confirm with each vendor, but we have summarized the six most important points in a checklist. Please make use of this when implementing BIM. 【Content (Excerpt)】 《check1》Sharing BIM information among project participants 《check2》Efficient modeling and flexible response to design changes 《check3》Smooth editing of BIM models for large projects ⇩ You can download the continuation of the checklist and details from the special site or the PDF button below ⇩

  • 2D CAD Construction
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM software [Revit] world standard tool

BIM software that excels in all aspects such as design, structure, equipment, and construction is 'Autodesk Revit'.

◆What is BIM? An abbreviation for Building Information Modeling. It is a "concept" aimed at improving the productivity of building design and construction. The Ministry of Land, Infrastructure, Transport and Tourism is promoting the BIM acceleration project for architecture in 2023 and the application of BIM/CIM principles for civil engineering, leading to the adoption of BIM not only by large general contractors but also by small and medium-sized enterprises. ◆Main Features of Autodesk Revit - A world-standard BIM tool for structural design - Active in all processes including design, structure, equipment, and construction - Prevents rework by creating building models that closely resemble the actual structure - Enables collaboration and modifications anytime and anywhere by utilizing cloud features There are various other functions and benefits! *For more details, please refer to the materials or feel free to contact us.

  • 3D CAD
  • Modeler
  • Workflow System
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 1

The opening of the "ROOFLAG Rental Housing Future Exhibition Hall," a wooden large-roofed building that is one of the largest in the country, has been realized through the utilization of BIM.

We would like to introduce a case study where Daito Trust Construction Co., Ltd. utilized Autodesk's BIM software "Revit." <Overview> Daito Trust Construction opened the "ROOFLAG Rental Housing Future Exhibition Hall," a facility aimed at considering the future of rental housing. This was their first experience using large CLT panels as beams, and the project progressed in a trial-and-error manner without knowing where the challenges lay. <Issues and Reasons for Implementation> - It was difficult to consider the construction procedures and quality assurance of the large roof using only 2D drawing information. - They wanted to utilize a BIM model to understand the entire building. <Implementation Results> Please check the PDF document for details!

  • 3D CAD
  • 2D CAD Construction
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 2

Expansion of telework and improvement of productivity through Revit and BIM360.

We would like to introduce a case study where Sakura Draft Works Co., Ltd. utilized Autodesk's BIM software "Revit." <Overview> In the architecture industry, the demand for equipment design using BIM is rapidly expanding, and Sakura Draft Works, which handles BIM software, is receiving a steady stream of requests for equipment design and modeling both domestically and internationally. The scope of operations and productivity have improved, and they are now considering overseas expansion. <Utilization Methods and Implementation Results> Please check the PDF document for more details.

  • 3D CAD
  • 2D CAD Construction
  • Other CAD related software
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 3

Based on the BIM model, analyze the optimal louver angle and pitch using generative design.

We would like to introduce a case study where Sato General Planning Co., Ltd. utilized Autodesk's BIM software "Revit." <Overview> Clients often present conflicting conditions, and in the past, decisions were typically made by selecting one option from two or three proposals. However, this approach did not ensure that the chosen design was truly optimal or that it could be adequately explained to the client. Therefore, the company began developing a new design methodology that seeks optimal design values using Revit. <Issues and Reasons for Implementation> - How to maximize the environmental performance of buildings within a limited budget. - While the shadow analysis function can determine the amount of sunlight entering the building, it is challenging to find the optimal louver angle that meets conflicting conditions such as "warm in winter and cool in summer." <Results of Implementation> For more details, please refer to the PDF document.

  • 3D CAD
  • 2D CAD Construction
  • Other CAD related software
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 4

A seamless process from design to construction with a single model incorporating the BIM model. Almost no rework!

We would like to introduce a case study of how Honma Corporation utilized Autodesk's BIM software "Revit." <Overview> Honma Corporation began its design BIM efforts in 2013 and construction BIM efforts in 2018, steadily advancing its use of BIM. The culmination of these efforts was the new construction project for the relocation of Isuzu Motors' Nagaoka branch, completed in 2020. What was the method of utilization that allowed for the project to be completed with almost no rework? <Results> Please check the PDF document for more details.

  • 3D CAD
  • 2D CAD Construction
  • Other CAD
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 6

The Future of Architecture and Mobility Illustrated by Takenaka Corporation × Mercedes-Benz EQ House

We would like to introduce a case study of how Takenaka Corporation utilized Autodesk's BIM software "Revit." <Overview> The EQ House, which emerged in Roppongi through a collaboration between Mercedes-Benz and Takenaka Corporation, adopts a spatial configuration that envisions mobility entering the home, creating a place where one can experience the future of living connected to mobility. How were BIM software Revit and BIM360 utilized to realize this project? We will present the case study. <Implementation Results> For more details, please check the PDF document.

  • 3D CAD
  • Other CAD related software
  • 2D CAD Construction
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 10

Achieving improved client satisfaction through the implementation of BIM workflows!

We would like to introduce a case study of how TDIndustries (USA) utilized Autodesk's BIM software "Revit." <Overview> In response to increasingly complex projects and the demand for excellent buildings to be completed in a short period, TDIndustries adopted Autodesk's Revit to significantly enhance its competitiveness. The company states, "To deliver better products to our customers, we must evolve alongside technology and make the most of our tools." We will present the methods they used to improve constructability and customer satisfaction. <Implementation Results> Please refer to the PDF document for more details.

  • 3D CAD
  • 2D CAD Construction
  • Other CAD related software
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 12

Automating Revit's design functions to improve productivity! A strategy for transitioning from manual work to programming-based BIM.

We would like to introduce a case study of Sato Kogyo Co., Ltd. utilizing Autodesk's BIM software "Revit." <Overview> In preparation for the increasingly severe labor shortage era, Sato Kogyo is working on automating the creation of BIM models and drafting, which were previously done manually, through programming. The tool that serves as their weapon for this is "Dynamo," a visual programming tool developed to automate software like Revit. How did they achieve automation and improve productivity? We will present the case study. <Implementation Results> Please check the PDF document for more details.

  • 2D CAD Construction
  • 3D CAD
  • Other CAD related software
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Recommended models for the BIM software "ARCHICAD"

An efficient and intuitive BIM software! You can naturally create BIM data while focusing on design.

"ARCHICAD" is software that has been developed for over 30 years with a focus on functionality as a BIM, ease of use, and ease of implementation. It streamlines operations at various stages of design and construction in the architecture industry, facilitating processes. It creates an environment where designers can concentrate on design, while supporting productivity improvements at construction sites. At Applied, we offer the 'Be-Clia CAD Type-S12IS series / Be-Clia CAD Type-M12IS series' as recommended operating models. 【ARCHICAD Features】 ■ Designer's approach ■ Ease of learning ■ High performance ■ Multi-platform ■ OPEN BIM ■ Global ■ CAD SHOP collaboration model *For more details, please refer to the related links or feel free to contact us.

  • 2022-04-11_10h13_32.png
  • 2022-04-11_10h13_38.png
  • 2022-04-11_10h13_44.png
  • Other PCs and OA equipment
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Seminar] Daiwa House Industry Co., Ltd.'s Offensive and Defensive DX Development

Revealing the secrets to successfully achieving DX by maximizing the value chain using construction data!

Our company will hold a seminar titled "Daiwa House Industry Co., Ltd.'s Offensive and Defensive DX Development." The company is promoting construction DX aimed at "industrialized construction" based on BIM. In this context, we will explain the organization of a value chain platform utilizing construction data, divided into two parts: "defensive," focusing mainly on operational efficiency, and "offensive," contributing to profit improvement, along with case studies. We will detail the secrets to successfully implementing DX. 【Seminar Details】 ■ Date and Time: January 22, 2024 (Monday) from 1:30 PM to 3:30 PM (Doors open at 1:00 PM) ■ Venue: JPI Conference Square ■ Address: 5-2-32 Minamiazabu, Minato-ku, Tokyo, Kowa Hiroo Building ■ Participation Method: In-person, live streaming, archived streaming ■ Speaker: Mr. Takaaki Miyauchi, Deputy General Manager of the Construction DX Promotion Department, Technical Headquarters, Daiwa House Industry Co., Ltd. and Director of Truss Co., Ltd. *For more details, please refer to the PDF document or feel free to contact us.

  • Technical Seminar
  • Management Seminar
  • Business Skills Seminar
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration