[Reverse Engineering Case] EP Equipment Oiless Bush Long Lifespan
Cost reduction through reverse engineering! Achieving longer lifespan through optimal material proposals.
Introducing a case study of reverse engineering for the "EP Equipment Hammering Device Oil-less Bush." New parts for consumables without drawings are newly manufactured through reverse engineering. By changing the material from metal to resin, a lifespan increase of 3 to 4 times is expected, achieving cost reduction. [Case Overview] - Cost reduction through reverse engineering - New manufacturing of consumables without drawings via reverse engineering - Expected lifespan increase of 3 to 4 times by changing the material from metal to resin *For more details, please refer to the PDF document or feel free to contact us.
- Company:千代田商事 東京本部
- Price:Other