Completion in just a few hours! Foundation method for installing EV chargers: "Spike Base."
You can install charging stations in parking lots and other locations! Just make a hole in the asphalt pavement, no large excavation or concrete foundation is required. 【Exhibition Participation】
The "Spike Base" is a construction method that allows for the creation of a foundation for EV chargers simply by drilling two or four small holes in asphalt pavement and driving steel pipe piles into them. 【Foundation Composition】 <For Small EV Chargers> Pipe clamps, base hardware, bolt holes for charger installation, steel pipe piles <For Large EV Chargers> Pipe clamps, connecting frames, frames for charger installation, pipe holders, steel pipe piles (The length of the connecting frame can be adjusted according to the charger.) There is no need for extensive excavation of the ground, and concrete foundations are not required, allowing for installation in just a few hours, achieving a short construction period and low cost. 【Exhibition】 'SMART ENERGY WEEK' Dates: February 28 (Wednesday), 29 (Thursday), and March 1 (Friday), 2024, 10:00 - 18:00 (until 17:00 on the final day) Venue: Tokyo Big Sight Booth Number: E58-11 *For more details, please refer to the materials. Feel free to contact us with any inquiries.
- 企業:ラスコジャパン
- 価格:Other