[BIM Software Implementation Case Study] Mechanical (Cultural Center)
Adopting an appropriate solution! A case where work was coordinated through open communication.
This project connects two reinforced concrete structures using steel trusses with concrete slabs on each floor. The complexity of the joints in the steel structure, as well as the joints between the steel and reinforced concrete structures, increased due to their shapes and angles, becoming a challenge for the project. By maintaining open communication among the design architects, structural engineers, and fabrication team, we were able to smoothly discuss and adopt appropriate solutions even for very challenging aspects of the overall steel construction. 【Case Overview】 ■Challenges - Complexity of the joints in the steel structure - Increased complexity of the joints between the steel and reinforced concrete structures due to their shapes and angles ■Result: We were able to adopt appropriate solutions *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special website below⇩
- 企業:トリンブル・ソリューションズ
- 価格:Other