Heat Countermeasures for the Training Room: Construction Edition

This time it's the "Film Installation Edition." We received a request for installation from the owner of a training gym to whom we had previously sent a quote and samples. We promptly held a meeting.
1. The locations of the windows to be installed
2. The type of film
3. Desired construction date → After the installation date is decided, we will arrange the installation and the film.
August 2024 - Installation Day
After greeting the customer, we began the installation. Today's work is outside.
Process
1-5 → Start of work - First, thoroughly clean the entire window glass.
6-8 → Completely wipe off moisture and prepare to apply the film.
9-12 → Apply the film.
A total of 12 steps to complete one piece of glass. Since there are three pieces of glass this time, we will repeat this process two more times.
Cautions for exterior film application
It is significantly affected by the wind.
- When applying the film with moisture, the wind quickly dries the moisture.
- The film is thin, so it can bend or warp due to the wind.
However, all three pieces were applied quite beautifully and turned out mirror-like. For detailed installation processes, please check the blog.


Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration