[Free Online Seminar] March 24, 2026 (Tuesday) Introduction of Methods to Shorten Lead Times in Factories and Logistics Warehouses
Introduction of Methods for Reducing Lead Time in Factories and Logistics Warehouses
~Analyzing Waiting, Bottleneck, and Movement Factors on Site through Simulation to Maximize Productivity~
================================
To reduce lead time in factories and logistics warehouses, it is not easy to determine "where the bottlenecks are" and "which improvement measures are the most effective."
Repeated trial and error in actual operations involves both costs and risks. Therefore, attention is being drawn to simulation verification in a virtual space. We will hold a free online seminar introducing practical methods for reducing lead time using 3D simulation software and offline teaching software for robots!
The seminar will cover themes such as "profit improvement measures through lead time reduction," "ROI in on-site improvements," and "risk reduction," incorporating practical case studies. This content is ideal for those looking to improve efficiency without relying on capital investment or large-scale improvements, as well as those interested in improvement methods using simulation. We encourage you to participate!

| Date and time | Tuesday, Mar 24, 2026 04:00 PM ~ 04:45 PM *Online streaming via Zoom (the participation URL will be provided later) |
|---|---|
| Entry fee | Free Free (pre-registration required) |
Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration
![[Notice of Exhibition Participation by Fukuda Co., Ltd.] 2025 YOKOHAMA Automotive Technology Exhibition](https://image.mono.ipros.com/public/news/image/1/950/148370/IPROS11407079545300320767.png?w=280&h=280)



