Responsibility for design and construction of solar power systems at Attic without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on its extensive experience in roofing work for major housing manufacturers over many years. Since we do not subcontract, we can respond quickly to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Kyocera Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P2
Applications/Examples of results
■ Mr. N's residence in Shimotsuke City, Tochigi Prefecture ■ Construction date: October 2007 ■ Construction period (installation): 3 days ■ Selected model specifications: Kyocera ■ Mounting method: Flat roof method ■ Modules: G180T-02E, 24 pieces, 4.32 kW
Company information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar power generation system [Construction achievements Case 355]](https://image.mono.ipros.com/public/product/image/7d3/2000192111/IPROS7503986514733381086.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 357]](https://image.mono.ipros.com/public/product/image/88c/2000192122/IPROS8246959837016140235.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 9]](https://image.mono.ipros.com/public/product/image/217/1377866007/IPROS_13573670252760566000.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 119]](https://image.mono.ipros.com/public/product/image/1e3/2000124596/IPROS3632483064891789715.jpg?w=280&h=280)


![[Leveling Correction] Leveling correction of concrete floors "Teratec Method"](https://image.mono.ipros.com/public/product/image/d08/1267539002/IPROS70063422645318547243.jpeg?w=280&h=280)


