Solar power generation system [Construction record Case 307]
Kyocera 3.72kw KHM186P-3CJCA
Responsibility for design and construction of solar power systems at Attic, without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on its extensive experience in roofing work for major housing manufacturers over many years. Since we do not subcontract, we can quickly respond to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Kyocera Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P2
Applications/Examples of results
■Y Residence, Ina Town, Saitama Prefecture ■Construction Date: August 2011 ■Construction Period (Installation & Electrical): 2 days ■Selected Model Specifications: Kyocera ■Mounting Method: Flat Roof Method ■Module: 3.72kw KHM186P-3CJCA
Company information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar Power Generation System [Construction Record Case 235]](https://image.mono.ipros.com/public/product/image/526/2000150863/IPROS1741918457379770504.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 444]](https://image.mono.ipros.com/public/product/image/66e/2000207709/IPROS1126547394304544916.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 462]](https://image.mono.ipros.com/public/product/image/6d3/2000228470/IPROS412593491960455191.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 488]](https://image.mono.ipros.com/public/product/image/a45/2000233662/IPROS7842381616680339851.jpg?w=280&h=280)
![Solar Power Generation System [Construction Achievement Case 85]](https://image.mono.ipros.com/public/product/image/431/2000464016/IPROS17308672955454769496.jpeg?w=280&h=280)

![[For Warehousing Industry] Muroran City - Up to 29% Reduction in Electricity Costs! Self-Consumption Solar Power Generation](https://image.mono.ipros.com/public/product/image/2117111/IPROS5655258043583108487.jpg?w=280&h=280)

![[For Dairy Farmers] Kushiro City: Reduce electricity costs by up to 29% with self-consumption solar power!](https://image.mono.ipros.com/public/product/image/2117111/IPROS6827594471968536245.jpg?w=280&h=280)
![[Seminar Video] Benefits of Self-Consumption Solar Power Generation Revealed Through Case Studies](https://image.mono.ipros.com/public/product/image/ef2/2001174060/IPROS16123023234529193990.jpeg?w=280&h=280)


