Points for Designing Factories with High Quality and Low Cost [Floor Slab Section]
Cracks in the floor slab can cause various adverse effects, such as a decrease in the accuracy of equipment. There are various causes of cracks in floor concrete, but the influence of overhead cranes (overhead conveyors) is also a factor. The vibrations from the crane can be transmitted from the columns to the floor slab, leading to the occurrence of cracks. To prevent this, a cushioning strip can be installed between the columns, foundation, and floor slab to absorb vibrations, which can help reduce the occurrence of cracks to some extent. 【Points】 ■ Implement measures against floor slab cracks ■ The causes of crack occurrence can also be found in the upper part of the building ■ The surprisingly significant occurrence of cracks due to crane vibrations ■ Establish a shock-absorbing strip to mitigate upper vibrations ■ The methods applied to the floor slab vary depending on the production equipment For more details, please refer to the catalog or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the catalog or feel free to contact us.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Hattori Architectural Office, Inc. is a comprehensive design firm that focuses on factory and plant design, as well as architectural design supervision, research, planning, and management services. Since its establishment in 1972, we have adhered to the founder Mitsugu Hattori's philosophy of "always from the customer's perspective," consistently maintaining a sincere attitude towards our clients. Our company, guided by this ideology, is a group of professionals capable of drawing out both the explicit needs that our clients are aware of and the latent needs they may not realize, enabling the creation of the desired buildings. Moving forward, we will continue to aim for the creation of buildings from the perspective of the client, based on our extensive track record and solid technical capabilities.