Integrating the buildings while ensuring smooth flow to improve work efficiency contributes to increased productivity and the smooth operation of production lines!
The "Connection Construction Method" refers to a technique where a new building (or an extension) is constructed between two or more existing buildings that are spaced apart, aligning the floor levels to integrate the previously independent structures. This construction creates pathways between locations that were originally separate buildings, leading to expected benefits such as increased productivity and smoother production lines. [Recommended for such factories!] ■ Want to make the most of existing buildings ■ Want to create connections between each building that stands independently on the site *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Construction Case Study】 On the vast site, buildings for each department were constructed with space in between. Some of the buildings did not meet the new seismic standards, so seismic reinforcement work was carried out. At the same time, we planned to expand the loading area (large canopy) to utilize the space between the buildings as a work area unaffected by weather. The expansion was to be carried out around the existing buildings, but due to the complex floor shape, the construction was divided into two phases. The buildings that underwent seismic reinforcement were equipped with vertical brace reinforcements, and several new roof sections were fitted with ribbed FRP skylights to create a well-lit workspace. *For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
Yoshizawa Architectural Structural Design Co., Ltd. is a comprehensive design office that consistently handles everything from planning and design to construction and after-service for factory rebuilding and renewal in-house. There are various reasons for wanting to renew an aging factory or introduce new equipment, but the current situation is fraught with challenges, such as the inability to stop production, the costs associated with relocating to a temporary factory, and the resulting decrease in productivity. Our company employs methods like "Cover Build," which involves constructing a steel frame over the existing factory while keeping production equipment in place, and "Separate," which divides the construction period into phases (e.g., Phase 1 and Phase 2) to avoid a decline in operational rates during rebuilding. Additionally, to assess the potential damage buildings may incur during an earthquake, we conduct various seismic surveys, including crack investigations, concrete strength assessments, and rebar layout measurements. Based on the survey results, we propose seismic reinforcement plans. We focus on preserving the assets of companies, including buildings, machinery, materials, and products. Furthermore, we ensure the prompt recovery and continuity of operations. Supporting everything from seismic diagnosis to reinforcement comprehensively is what we, "Yoshizawa," are dedicated to.