Diverse power procurement and cost reduction!
We offer a service for switching to a new power provider that reduces electricity costs through the transition to new electricity sources. The basic fees of regional power companies include high costs such as equipment expenses, facility maintenance costs, and labor costs. New power companies cut these costs and offer discounts on basic fees. Additionally, there is a wholesale electricity market where surplus electricity generated by power facilities in various regions is collected. This electricity is procured at low costs and provided stably. 【Features】 ■ No workload ■ No cost burden ■ No power outages *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Other Features】 ■ Keep basic charges low ■ Stable procurement of surplus electricity at a low cost *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Riken Energy Co., Ltd. operates power generation facilities in Hyogo Prefecture and Shimane Prefecture as its own power plants, with the design and construction of these plants carried out by its group company, Riken Kogyo. To maintain a good power generation capacity over the long term, our company has accumulated know-how through its own power plants and proposes maintenance plans, such as panel cleaning and regular inspections of equipment, tailored to each power generation operator.