Simultaneously achieve 'ideal expansion' and 'reset the building to current legal standards'! Properly expand and renovate factories.
Our company will resolve issues through legalization and carry out expansion work appropriately. Legalization refers to the preparatory process until obtaining permission when construction cannot be carried out due to legal issues during expansion or renovation. For those who have been turned away by contractors and have given up, or for those who have found themselves in violation of building regulations and do not know what to do, our company can propose suitable solutions based on our extensive experience and know-how. 【Yoshizawa's Proposed Expansion Plan】 ■STEP 1: Fully utilize legalization according to the purpose of the issue ↓ Obtain construction permission ■STEP 2: Achieve expansion work while maintaining operations *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
【Features】 ■ Planning construction on the current land ■ Carrying out construction without stopping operations ■ Making buildings earthquake-resistant *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
Yoshizawa Architectural Structural Design Co., Ltd. is a comprehensive design office that consistently handles everything from planning and design to construction and after-service for factory rebuilding and renewal in-house. There are various reasons for wanting to renew an aging factory or introduce new equipment, but the current situation is fraught with challenges, such as the inability to stop production, the costs associated with relocating to a temporary factory, and the resulting decrease in productivity. Our company employs methods like "Cover Build," which involves constructing a steel frame over the existing factory while keeping production equipment in place, and "Separate," which divides the construction period into phases (e.g., Phase 1 and Phase 2) to avoid a decline in operational rates during rebuilding. Additionally, to assess the potential damage buildings may incur during an earthquake, we conduct various seismic surveys, including crack investigations, concrete strength assessments, and rebar layout measurements. Based on the survey results, we propose seismic reinforcement plans. We focus on preserving the assets of companies, including buildings, machinery, materials, and products. Furthermore, we ensure the prompt recovery and continuity of operations. Supporting everything from seismic diagnosis to reinforcement comprehensively is what we, "Yoshizawa," are dedicated to.