Explaining the general trends in cost estimates for the replacement work of simple tent warehouses!
When warehouses exceed 4 meters, construction costs may increase! Introducing trends in cost estimation.
For large-scale temporary tent warehouses, a work vehicle for high-altitude operations will be necessary. This means that the cost of arranging that work vehicle will also be passed on to the construction costs, so the total construction costs for warehouse projects over 4 meters will likely be higher. Additionally, there may be unfortunate cases where some contractors fail to accurately estimate construction costs without properly considering the difficulty of the work. Therefore, it is essential for clients to actively participate in site inspections necessary for estimates. In other words, meticulous pre-estimation is crucial to avoid additional construction costs. [Key Points] ■ Construction costs may significantly increase for warehouses exceeding 4 meters. ■ Meticulous pre-estimation is important to avoid additional construction costs. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
In order to provide the best products that meet our customers' needs, we carry out everything from planning, design, production, construction, to aftercare in a unified in-house system. With the support of local stores and businesses, we have accumulated over 30 years of experience and achievements since our founding. Leveraging the experience we have cultivated so far, we will strive to improve the "environment" of your workplace or factory.