Void Filling and Embankment Method: 'TerraFill Method' allows for the selection of permeable or impermeable options.
Terafil method
Lightweight filling and embankment method "Terrafill" designed for weak ground areas.
When cavities occur under the floors of factories and warehouses... the vibrations and noise from the installed machinery worsen, the floor shakes every time a fork (reach) lift passes, cracks and unevenness appear on the floor, causing employees to trip, which greatly reduces work efficiency. Additionally, in the event of natural disasters such as earthquakes, the floor may collapse. 【What is the Terafil Method?】 The Terafil method is the lightest cement-based filling and embankment method available, offering a choice between permeable type "Terafil OC" and impermeable type "Terafil CC." In areas with weak ground where ground subsidence occurs, the weight of the cavity filling material or embankment material can further burden the weak ground and promote subsidence. Developed for filling and embankment in soft ground areas, Terafil possesses about ten times the strength compared to filling and embankment materials made primarily of soil, while minimizing the load during construction. The permeable type "Terafil OC" is suitable for filling and embankment materials in areas with high groundwater levels due to its low buoyancy characteristics. ▼ Features of Terafil ▼ - Lightweight and strong - Excellent permeability - Consistently high quality - Compact preform method - Compatible with subsidence correction through combined methods Toll-free number: 0120-873-835
Inquire About This Product
basic information
●Light and Strong● Terafil is the lightest among cement-based materials, possessing about 10 times the strength of filling and embankment materials primarily made of soil. This allows for construction that maintains a certain strength while minimizing the load on weak ground. ●Excellent Permeability (Terafil OC)● With permeability close to that of fine sand, it minimizes the impact of buoyancy after hardening even when poured in areas with high groundwater levels, and does not significantly alter the flow of groundwater after pouring. In addition to the permeable type "Terafil OC," the impermeable type "Terafil CC" can also be manufactured and poured. ●Stable High Quality● Stable foam generation, mixing just before pouring using the pre-foam method, and thorough construction management enable the production and pouring of low-density, stable lightweight filling and embankment materials. ●Compact Pre-Foam Method● The pre-foam method of construction minimizes plant size. There is no need for silo installation, which shortens the construction period required for plant setup. *For more details, please download the PDF or feel free to contact us. Toll-free number: 0120-873-835*
Price range
Delivery Time
Applications/Examples of results
▼Application Scope of Terafil▼ ● Filling and embankment in soft ground areas where load reduction is desired ● Filling and embankment in locations requiring permeability and infiltration ● Filling and backfilling in areas where liquefaction prevention is desired ● Filling of voids under buildings ● Backfilling of unnecessary underground parking lots ● Filling of unnecessary underground fuel tanks and pits ● Filling or sealing of abandoned pipes, shafts, and air raid shelters ● Backfilling behind retaining walls ● Embankment in areas where compaction is difficult Please feel free to contact us. Toll-free number: 0120-873-835
Detailed information
-

Density and strength of terafil.
catalog(4)
Download All Catalogs
News about this product(5)
Company information
The main business activities of Mainmark involve "returning tilted floors and buildings to a level state" and "preventing existing floors and buildings from tilting." We primarily offer the "TerraTech Method," which allows us to level tilted floors without stopping operations, and we provide various construction proposals tailored to our customers' concerns, from investigation to execution. ■ Nationwide responsible construction with over 5,000 completed projects Mainmark has established offices in eight locations across the country and conducts responsible construction nationwide. We serve a wide range of clients, including factories, stores, warehouses, offices, and apartments. ■ Non-disruptive floor tilt and subsidence correction method "TerraTech Method" Our main service, the "TerraTech Method," is a patented technique that injects TerraTech resin (rigid polyurethane foam resin) into concrete floors that have developed tilts, subsidence, steps, or voids due to ground subsidence or earthquakes. The expansion force of the resin levels the sunken floor and fills the voids beneath it. This technology is also registered with the Ministry of Land, Infrastructure, Transport and Tourism's "NETIS," ensuring its reliability. Patent No. 4896949 "Method for Correcting Sunken Floors" NETIS Registration No. "QS-080007"

