Measures against management risks! Prevention of worsening tilt and hollowing out 'TerraTech Method'
TerraTech method
Is it okay to leave the floor slant caused by earthquakes or ground subsidence as it is? Shall we start risk management from the floor?
The tilt and hollowing of the floor can cause various issues, leading to management risks. The "Teratec Method" is recommended for addressing tilt and hollowing and preventing deterioration. This patented method involves injecting Teratec resin under the concrete floor slab, using its expansion force to fill the voids beneath the floor and restore the sunken floor to a level position. It corrects the "tilt," "sinking," "steps," and "deflection" of the concrete floor without damaging it and without interrupting operations. 【Management Risks Due to Floor Tilt (Excerpt)】 ■ Human Damage - Employees tripping over steps and getting injured, leading to labor accident issues - Employees experiencing health problems such as poor physical condition, shoulder stiffness, and headaches ■ Quality and Function Decline - Machines unable to maintain level, resulting in product defects (quality decline) - Vibrations causing inaccuracies in machines and inspection equipment (affecting production) ■ Decreased Work Efficiency - Time spent adjusting machine levels - Safety devices on automatic transport systems activating, halting operations *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835
Inquire About This Product
Related Videos
basic information
【Features of Teratec Construction Method】 ■ Does not interrupt operations ■ Does not damage the floor ■ Short construction period ■ Patent obtained ■ Over 4,200 construction achievements *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835
Price information
After investigating the sinking volume and cavity volume, we will provide a design estimate. The inspection is free of charge, so please feel free to consult with us.
Delivery Time
Applications/Examples of results
**Main Construction Sites** Stores: Shopping centers, large retail stores, convenience stores, pachinko parlors, restaurants Warehouses: General warehouses, collection and distribution centers, logistics hubs, frozen warehouses, platforms Factories: Various manufacturing plants, food factories, cold storage rooms, inspection rooms Schools: Classrooms, gymnasiums, auditoriums, cafeterias Public Works: Roads, footbridges, various airport facilities, schools, community centers **Main Clients** ▼ Government Agencies Kanto Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Chubu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Kinki Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Chugoku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Kyushu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Hokuriku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Tokyo Aviation Bureau, Ministry of Land, Infrastructure, Transport and Tourism Tokyo Metropolitan Government, First Construction Office Iwate Prefecture, Department of Land Development Aomori Prefecture, Shimokita Regional Citizens Bureau Kyoto Prefecture, Civil Engineering Office Chiba Prefecture, Sewerage Public Corporation ▼ Private Companies Obayashi Corporation Kajima Corporation Taisei Corporation Takenaka Corporation Shimizu Corporation Daiwa House Industry Co., Ltd. Toda Corporation Mitsui Sumitomo Construction Co., Ltd. Ando & Associates Tokyu Construction Co., Ltd. Goyo Construction Co., Ltd. Maeda Corporation Fujita Corporation Nishimatsu Construction Co., Ltd. NIPPO Corporation
catalog(6)
Download All Catalogs![[Inclination/Subsidence/Step Difference/Cavity Filling] "TerraTech Method" Correction of subsidence in concrete floor slabs due to ground subsidence or disasters.](https://image.mono.ipros.com/public/catalog/image/01/494/209281/IPROS62099550671294161372.png?w=120&h=170)
![[Ground Improvement] Correction of Building Tilt and Ground Improvement Method Directly Under the Building](https://image.mono.ipros.com/public/catalog/image/01/022/323325/IPROS10288962149489855838.jpeg?w=120&h=170)
News about this product(4)
Company information
The main business activities of Mainmark involve "returning tilted floors and buildings to a level state" and "preventing existing floors and buildings from tilting." We primarily offer the "TerraTech Method," which allows us to level tilted floors without stopping operations, and we provide various construction proposals tailored to our customers' concerns, from investigation to execution. ■ Nationwide responsible construction with over 5,000 completed projects Mainmark has established offices in eight locations across the country and conducts responsible construction nationwide. We serve a wide range of clients, including factories, stores, warehouses, offices, and apartments. ■ Non-disruptive floor tilt and subsidence correction method "TerraTech Method" Our main service, the "TerraTech Method," is a patented technique that injects TerraTech resin (rigid polyurethane foam resin) into concrete floors that have developed tilts, subsidence, steps, or voids due to ground subsidence or earthquakes. The expansion force of the resin levels the sunken floor and fills the voids beneath it. This technology is also registered with the Ministry of Land, Infrastructure, Transport and Tourism's "NETIS," ensuring its reliability. Patent No. 4896949 "Method for Correcting Sunken Floors" NETIS Registration No. "QS-080007"