[Construction Example] Bag Manufacturing Factory in Miyagi Prefecture
We will introduce a case of a bag manufacturing factory that sank due to ground subsidence and the impact of an earthquake!
We would like to introduce a case study of floor sinking correction work and subfloor void filling work carried out at a bag manufacturing factory located in Miyagi Prefecture. The neatly arranged bag-making machines were tilted due to floor sinking, which hindered production. As a temporary measure, legs (for height adjustment) were installed under the machines to level them, allowing work to continue. Consequently, we received a request for correction from the company, as we can quickly make adjustments without removing the machines, and we proceeded with the work. In addition to the floor sinking, voids were also observed under the floor, so we carried out the filling work as well. [Case Study] ■ Construction Area: Approximately 730m² ■ Maximum Sinking Amount: Approximately 110mm ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.