[Case Study on Solving Issues in Smart Factory Construction Support] Equipment Maintenance
Significant reduction of personnel-related tasks! A case where improvements in equipment utilization and maintenance efficiency were achieved.
We will introduce a case study that solved the issue of "equipment maintenance" with the support of Astec in building smart factories. By utilizing tools for equipment maintenance, not only can equipment troubles and line downtime be reduced, but it is also possible to significantly reduce personnel-dependent tasks by accumulating maintenance know-how. By using an all-in-one tool that includes operational monitoring, maintenance parts inventory management, trouble aggregation, inspection management, and failure prediction detection, improvements in equipment operating rates and maintenance efficiency can be achieved. [Case Overview <Maintenance Parts Inventory Management>] ■ Expected Effects - Improvement of equipment operating rates, elimination of line downtime, reduction of maintenance parts inventory ■ Main Functions and Features - Utilization of handheld readers and barcodes, order point management, integration with inspection management *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Summary of Other Cases <Trouble Aggregation>】 ■Expected Effects ・Improvement of equipment operation rate, reduction of MTTR, and acceleration of trouble response ■Main Functions and Features ・Visualization of trouble response, data accumulation, analysis of trouble content, and integration with operation monitoring *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Our company was founded in 2001 and provides practical consulting to support improvement activities in the manufacturing industry, including revenue enhancement, productivity improvement, lead time reduction, and inventory reduction through the introduction of DX systems. Based on our unique production management method, the "One-Piece Flow Production System," we create tailored original programs that address each company's specific management challenges, progressing from "on-site improvements" to "system improvements" and then to "production innovation," providing appropriate solutions. If you encounter any issues that need to be resolved, please feel free to contact us. We will definitely provide solutions that satisfy your company. [Astec Consulting HP] https://www.ast-c.co.jp/