[Case Study of Problem Solving for Smart Factory Construction Support] Dedicated Subsystem
Improving the speed of improvement by utilizing ICT tools! A case study of establishing the improved system within the system.
We would like to introduce a case where we solved the challenges of "dedicated subsystems" with the support of Astec in building smart factories. In addition to the core systems that govern the management of manufacturing companies, there are times when subsystems tailored to individual organizations and functions are needed for production planning, tracking production results, monitoring process progress, equipment operating status, inventory management, and design load management. Our company proposes, implements, and supports the utilization of such field-oriented subsystems while considering integration with the client's core systems. By utilizing ICT tools, we improve the speed of enhancements and link them to outcomes such as increased productivity, while also establishing the improved systems within the organization. [Case Overview] ■ Expected Effects: Solving specific issues on-site, low-cost investment ■ Main Functions and Features: Customized for each issue, field-oriented proposals *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Our company was founded in 2001 and provides practical consulting to support improvement activities in the manufacturing industry, including revenue enhancement, productivity improvement, lead time reduction, and inventory reduction through the introduction of DX systems. Based on our unique production management method, the "One-Piece Flow Production System," we create tailored original programs that address each company's specific management challenges, progressing from "on-site improvements" to "system improvements" and then to "production innovation," providing appropriate solutions. If you encounter any issues that need to be resolved, please feel free to contact us. We will definitely provide solutions that satisfy your company. [Astec Consulting HP] https://www.ast-c.co.jp/