By converting on-site drop-off work to precast, significant reductions in construction time and improvements in productivity can be achieved.
■ By utilizing precast technology, we achieve significant reductions in construction time and improvements in productivity. ■ The use of hardware connections accelerates construction and reduces labor on-site. ■ It can accommodate drop heights of 500 to 1000 mm. ■ It is compatible with drainage flumes ranging from HF300 to HF900. ■ The standard extension for the waterway section is 4 meters for drainage flumes below HF500 and 6 meters for those above HF600. ■ By adjusting the extension and using a stepped drop, it can accommodate longitudinal slopes and effectively reduce flow velocity. *We can also consider specifications other than those listed. Please consult us.*
Inquire About This Product
basic information
[Precast Products Features] - No need for formwork assembly or removal - No need for curing on-site - Less affected by on-site weather conditions - High quality due to factory production
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
Company information
Our company, under the belief of contributing to society through the development of social infrastructure, constantly strives for quality improvement and technical advancement. With the conviction that business is about people, we respect humanity, engage in talent development and fair personnel practices, and cultivate a free and open corporate culture. We aim to deepen mutual understanding and trust, working together towards the development of the company and the enhancement of welfare, while concentrating all our efforts on stabilizing and expanding our management foundation.