[Construction Case] Correction Work for Floor Subsidence in Store - Continuous Night Work Without Stopping Business
Maximum subsidence of 144mm, construction area of approximately 2,300m2! Introduction of a case where corrections were made over 11 consecutive nights of construction.
Due to the impact of the Great East Japan Earthquake, the floor inside the store has significantly sunk. As a result of the floor sinking, gaps were observed between the floor and walls, as well as between the walls and ceiling. Therefore, our company carried out repair work. The "Upcon Method," which can be implemented at night during the business suspension, was adopted for the repairs. Additionally, voids were observed under the floor, so filling work was also conducted. 【Construction Overview】 ■ Construction Area: Approximately 2,300m2 ■ Maximum Settlement: 144mm ■ Construction completed in 2012, with repairs made over 11 consecutive nights. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(3)
Download All CatalogsCompany information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.