Submit a completion report after the work! Limited the installation locations of the scaffolding to two places and proposed the content as requested.
We received a request from a customer stating, "Due to pigeon droppings and feathers, our products and packaging boxes are being damaged, and we would like you to respond urgently. We would like the installation of the scaffolding to be considered at the minimum necessary locations." We visited the site with a specialist in bird damage control and conducted an on-site hearing to assess the situation. We confirmed the timing and locations of the pigeon damage and proposed two options on-site based on the budget and construction period. The customer expressed, "This time, with a limited budget, your suitable proposal that matched our budget and timeline was extremely helpful." 【Case Overview】 ■ Industry: Residential equipment manufacturer ■ Subject: Building repair ■ Request: Pigeon control ■ Construction details: 2-week construction period (2 days for scaffolding installation, approximately 10 days for construction, 1 day for scaffolding dismantling) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei region, Chusei region (surrounding Mie).
Inquire About This Product
basic information
【Response Details】 ■ Based on the pigeon damage situation, we will propose two plans: (1) installation of bird nets at the roof openings on the outside of the building and inside, and (2) installation of bird nets only at the roof openings on the outside of the building, along with a proposal document and estimate to be provided later. ■ Regarding the installation of scaffolding for elevation, we will limit the installation locations to two places to also serve as a temporary storage area, and we will propose this according to your preferences. ■ Work will commence approximately one week after the request, with a schedule submitted before the work begins and a completion report submitted after the work is finished. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(4)
Download All CatalogsCompany information
An unwavering "spirit of service" to strongly support businesses in Mie. By upholding the "three promises" in our business, all employees strive to face our customers and respond to their needs. ■□■ Key Area: Mie Prefecture, Hokusei and Chusei Regions ■□■