Construction scheduled to match the customer's holiday! We also performed caulking to prevent water from entering.
I received a request from a customer saying, 'The air conditioner that is currently installed has been there for a long time, and it seems to have poor heating efficiency, which has led to negative feedback from the office staff. I would like to take this opportunity to replace it, so could you please provide a quote?' I visited the site and conducted an on-site survey. I also selected the air conditioner, and provided a comprehensive estimate that included the selection of a new unit, replacement from the current air conditioner, refrigerant recovery and destruction, and removal work. On the day of the work, since it was an office, I took precautions to prevent dirt and scratches by covering the steel boards installed on the walls before proceeding with the installation. [Case Overview] ■ Industry: Retail ■ Subject: Air conditioning unit ■ Request: Air conditioner replacement work ■ Work details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Inquire About This Product
basic information
[Response Details] - After receiving the order, we consulted with the customer about the construction date and scheduled the work to align with the customer's days off. - We also replaced the cable cover to ensure that the cables do not overlap with the steel board surface. - Caulking was applied to prevent water from entering. - We confirmed that there were no scratches or damages before handing over the work. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(4)
Download All CatalogsCompany information
An unwavering "spirit of service" to strongly support businesses in Mie. By upholding the "three promises" in our business, all employees strive to face our customers and respond to their needs. ■□■ Key Area: Mie Prefecture, Hokusei and Chusei Regions ■□■