Installation of a chain block near the ceiling inside the building! A case where the manufacturer and model were also selected.
There is a process for transporting gas cylinders in the building for waste disposal, and we received a request to consult about the installation of a chain block there. To install the chain block near the ceiling inside the building, high-altitude work is required. Considering the construction period, using a crane for the work would be the smoothest option, but based on the layout of the factory and the space for delivery, we decided to set up a rolling tower this time. We safely set up the Kito chain block and trolley purchased by Sakashige. This made it possible to carry out the gas cylinder transportation work smoothly. [Case Overview] ■ Industry: Waste disposal facility ■ Request: Chain block installation work ■ Work details: Half a day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Inquire About This Product
basic information
【Response Details】 ■ Installed a rolling tower considering the layout and loading space within the factory ■ Safely set up the chain block and trolley of the Kito products purchased by our company ■ Enabled smooth transportation of gas cylinders *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(4)
Download All CatalogsCompany information
An unwavering "spirit of service" to strongly support businesses in Mie. By upholding the "three promises" in our business, all employees strive to face our customers and respond to their needs. ■□■ Key Area: Mie Prefecture, Hokusei and Chusei Regions ■□■