Immediately after receiving the request, we conducted a verification operation on-site! A case where the floor load capacity was calculated and constructed.
We would like to introduce a case where anchor fixing work was carried out to prevent the tipping of equipment and machinery within the factory. Immediately after receiving the request, we conducted a site inspection. First, we checked the condition of the space under the floor, as the length of the anchors varies depending on the underfloor conditions. Additionally, since the legs of the anchors can break, we calculated the load-bearing capacity of the floor and proceeded with the installation. 【Case Overview】 ■ Industry: Automotive Parts ■ Subject: Anchors ■ Request Details: Anchor fixing work ■ Construction Duration: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Nakasei District (surrounding Mie).
Inquire About This Product
basic information
【Response Details】 ■ Conducted verification work on-site immediately after receiving the request. ■ First, checked the underfloor conditions, as the length of the anchors varies depending on the state of the underfloor space. ■ Calculated the load-bearing capacity of the floor and proceeded with the installation, as there are cases where the anchor legs may break. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(4)
Download All CatalogsCompany information
An unwavering "spirit of service" to strongly support businesses in Mie. By upholding the "three promises" in our business, all employees strive to face our customers and respond to their needs. ■□■ Key Area: Mie Prefecture, Hokusei and Chusei Regions ■□■

