"Flow weirs" that measure the flow rate of hot water! We design equipment tailored to the customer's site and geothermal well.
We would like to introduce the roles of each part of the blowout test equipment. The "flash tank" and "flash pipe" separate the two-phase flow that erupts from the geothermal well into steam and hot water in two stages. Additionally, the "flow weir" measures the flow rate of hot water, and the "storage tank" stores the hot water that has passed through the flow weir before returning it underground. [Overview] ■ Flash Tank / Flash Pipe - Separates the two-phase flow that erupts from the geothermal well into steam and hot water in two stages. ■ Flow Weir: Measures the flow rate of hot water. ■ Storage Tank: Stores the hot water that has passed through the flow weir before returning it underground. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
By leveraging my experience as a user, I will contribute to the utilization of low-cost, high-efficiency, and clean equipment by responding to various customer needs regarding equipment. Additionally, I will fulfill our corporate social responsibility and strive to maintain and improve the natural environment.