Improved flow by 1.35%! Here is a case study on the clean removal of rust and calcium attached to the circuit.
We would like to introduce a case where we performed cleaning of cooling blocks at the request of a packaging manufacturer in the medical field. There was a significant amount of calcium and aluminum corrosion deposits near the entrance of the circuit and inside the circuit, confirmed by an endoscope camera. We took custody of the mold to carry out the work, and both rust and calcium were thoroughly removed. The flow rate improved from 7.5 L/min to 10.1 L/min, a 1.35% improvement. 【Case Summary】 ■ Issue - A large amount of calcium and aluminum corrosion deposits were present near the entrance of the circuit and inside the circuit. ■ Result - A total of 6,696 L was flushed. - The flow rate improved from 7.5 L/min to 10.1 L/min, a 1.35% improvement. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Since its founding in 1947, we have been dedicated to "monozukuri" (manufacturing), particularly focusing on "capital goods" for 75 years. With the unique experience and technology we have built up, we continue to provide high-quality products that cannot be imitated by other companies, delivered on the requested schedule and at a fair price.