Scheduled to be implemented in April 2025! It will be mandatory for all new residential and non-residential buildings.
In June 2022, the "Act to Partially Amend the Law Concerning the Improvement of Energy Consumption Performance of Buildings to Contribute to the Realization of a Decarbonized Society" was promulgated, resulting in amendments to the Energy Conservation Act for Buildings, which mandates compliance with energy-saving standards for nearly all buildings. Additionally, with the revision of the Building Standards Act, there will be a review of the targets for building confirmation and inspection, as well as the implementation of a system for omitting reviews. The application procedures for building confirmation conducted by building owners and designers will also change. While ensuring sufficient preparation time for both applicants and reviewers, the law is scheduled to come into effect in April 2025, and buildings that commence construction after the enforcement date will be subject to compliance obligations. [Key Points] - Compliance with energy-saving standards will be mandatory for nearly all new residential and non-residential buildings. - Compliance reviews for energy-saving standards will be conducted as part of the building confirmation process. - Scheduled to come into effect in April 2025. *For more details, please refer to the PDF document or feel free to contact us.*
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company provides design support, CG architecture, and housing inspections. We have dedicated personnel in each section to ensure that data and information are seamlessly transferred without waste, maintaining thorough consistency. We take on the cumbersome tasks so that you can focus on your core construction work. Additionally, with a track record of supporting over 700 projects annually, we continuously collaborate with the sales process's presentation drawings, the CG department, and the subsequent design and structural design departments. Therefore, there are various benefits, including not only the consistency of the drawings but also time reduction and cost savings.