[Construction Example] Manufacturing Factory: Underfloor Void, Hollow, and Loose Filling Work
Introducing a case where the space under the floor was filled 100% without moving the machinery!
We would like to introduce a case of "filling work for floor voids, cavities, and looseness" carried out at a manufacturing factory in Gunma Prefecture. It was necessary to compact and reinforce the ground around the machinery while filling the voids, so we adopted the Upcon method, which allows work to be done in a narrow space without removing the machinery. We performed resin injection work while constantly checking the levels, and after construction, we confirmed the resin filling using a CCD camera. 【Case Overview】 ■ Construction Area: Approximately 140m2 ■ Area: Gunma Prefecture ■ Construction Period: 1 day *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.