[Construction Example] Warehouse and Factory: Floor Slab Settlement Correction and Void Filling Work
Due to ground subsidence, there is sinking and sagging in the concrete floor! The items remain as they are, and the concrete floor will be repaired in a short time.
We would like to introduce a case of "floor sinking correction and void filling work" carried out at a warehouse and factory located in Hokkaido. Due to the effects of ground subsidence, there were signs of sinking and sagging in the floor, and we received a request for correction from the company. Before the work, the racks used for storing goods, which had become tilted due to floor sinking, were adjusted in height using spacers, but after the work, they became flat. [Case Overview] ■ Construction Area: 334m2 ■ Maximum Sinking Amount: 105mm ■ Construction Period: 3 days ■ Area: Sapporo City, Hokkaido *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.