[Construction Case] Office/Parts Storage: Settlement Correction Work
No interruption in operations, correction of subsidence! Introducing a case where the floor level was adjusted and the gaps in the walls were improved.
We would like to introduce a case of "settlement correction work" carried out at the office and parts warehouse of an automobile manufacturer located in Hokkaido. In this company, the building had tilted due to settlement, causing issues with the opening and closing of doors and creating gaps in the ceiling. Therefore, the Upcon method was adopted because it could be implemented without stopping operations and within a short construction period. After the work was completed, the floor levels throughout the office and parts warehouse were corrected, and the gaps in the walls that had existed before the construction were also improved. 【Case Overview】 ■ Construction Area: 345m2 ■ Maximum Settlement: 63mm ■ Maximum Gap: 70mm ■ Area: Office of an automobile manufacturer located in Hokkaido ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.